Hi,
We are carrying out Ehanced Commissioning EAc3 on a large recreation centre which is made up of an ice rink, swimming pool, gym, offices etc. Under LEED EAc1 the ice rink plant is considered a process energy load, however under EAc3 its states refrigeration systems have to be commissioning which is generally applied to split and VRF AC systems. Althought the ice rink system will be commissioned under the normal contract, can someone clarify whether the ice rink system is required to be commissioned and documented under this credit