Forum quick links
Exterior lighting design
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Sivarajah Ragulakeethan on
Hi, We are working on commercial interior projects. While doing the model we didn't receive exterior lighting design.
Co-processing as an approach to Waste Management
CS-2009 MRc2:Construction waste managementposted by Katherine Ann Resurreccion on
Hi All, I would like to hear your opinion about co-processing as an acceptable waste diversion to meet the intent of this credit.
Fuel Rates for Non-traditional Fuel Sources
NC-2009 EAp2:Minimum energy performanceposted by Gopinath Vasu on
Hi All, I am working on a project where rice husk steam boiler is used for process. The fuel source (rice husk) is available at a free of cost for the project.
Providing private buses
NC-v4 LTc5:Access to quality transitposted by Hanh Truong on
LEED 2009 allowed the use of private shuttle buses in the achievement of SSc4.1: Alternative Transportation if "Shuttle buses should provide direct access to transit facilities within 2 miles of th
Incomplete spaces for solar panel and future process load
NC-2009 EAp2:Minimum energy performanceposted by Hanh Truong on
Dear Sir, I am working on factory project which targets to reach a LEED 2009 certified level.
Multiple AHU's serving one zone
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Lavanya Veerappa on
Hi, I am working on C & S project wherein 4 AHU's are serving an entire office area per floor.
Energy Rates for CHP used Project
NC-2009 EAp2:Minimum energy performanceposted by SAMY Chamy on
Dear All Our Project have CHP (2 CNG Generator 500Kw with VAM Chillier 100TR) what is rate we use for BASE Case and Design Case For Design case we use the Fuel(CNG) cost invested to run a Gener
Controllability of lighting in Shared Area
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Jonathan Mak on
We are having a hotel project that would like to attempt this credit.
Energy Simulation Baseline
CS-2009 EAc1:Optimize energy performanceposted by Yong Lee Low on
Hi, I am working on a office building of about 15,000sqm using AHU with underfloor system.
Factory with a high unregulated energy loads- LEED EAp2
NC-2009 EAp2:Minimum energy performanceposted by Hanh Truong on
Hello, I am a beginner in LEED. I have a question regarding to EAp2. I am recently preparing LEED certificate report for a factory.