Forum quick links
Fuel Rates for Non-traditional Fuel Sources
NC-2009 EAp2:Minimum Energy Performanceposted by Gopinath Vasu on
Hi All, I am working on a project where rice husk steam boiler is used for process. The fuel source (rice husk) is available at a free of cost for the project.
Providing private buses
NC-v4 LTc5:Access to quality transitposted by Hanh Truong on
LEED 2009 allowed the use of private shuttle buses in the achievement of SSc4.1: Alternative Transportation if "Shuttle buses should provide direct access to transit facilities within 2 miles of th
Incomplete spaces for solar panel and future process load
NC-2009 EAp2:Minimum Energy Performanceposted by Hanh Truong on
Dear Sir, I am working on factory project which targets to reach a LEED 2009 certified level.
Multiple AHU's serving one zone
CS-2009 IEQp1:Minimum IAQ Performanceposted by Lavanya Veerappa on
Hi, I am working on C & S project wherein 4 AHU's are serving an entire office area per floor.
Energy Rates for CHP used Project
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All Our Project have CHP (2 CNG Generator 500Kw with VAM Chillier 100TR) what is rate we use for BASE Case and Design Case For Design case we use the Fuel(CNG) cost invested to run a Gener
Controllability of lighting in Shared Area
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Jonathan Mak on
We are having a hotel project that would like to attempt this credit.
Energy Simulation Baseline
CS-2009 EAc1:Optimize Energy Performanceposted by Yong Lee Low on
Hi, I am working on a office building of about 15,000sqm using AHU with underfloor system.
Factory with a high unregulated energy loads- LEED EAp2
NC-2009 EAp2:Minimum Energy Performanceposted by Hanh Truong on
Hello, I am a beginner in LEED. I have a question regarding to EAp2. I am recently preparing LEED certificate report for a factory.
Aerators use in water flow fittings
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Magda Aghababyan on
Hi, Currently we are working in a office project. For the aesthetic purposes the project owners has selected flow fittings which does not meet the LEED requirement.
Water use in a campus project
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Magda Aghababyan on
We are working on a LEED campus project which is going to be certified with one new construction building (will be certified LEED NC 2009) and some other buildings which are not going to be certifi