Fuel Rates for Non-traditional Fuel Sources

NC-2009 EAp2:Minimum Energy Performance
posted by  Gopinath Vasu  on 

Hi All, I am working on a project where rice husk steam boiler is used for process. The fuel source (rice husk) is available at a free of cost for the project.

3
Mon Jul 17, 2017, 2:37 pm

Providing private buses

NC-v4 LTc5:Access to quality transit
posted by  Hanh Truong  on 

LEED 2009 allowed the use of private shuttle buses in the achievement of SSc4.1: Alternative Transportation if "Shuttle buses should provide direct access to transit facilities within 2 miles of th

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Jul 11, 2017, 4:53 am

Incomplete spaces for solar panel and future process load

NC-2009 EAp2:Minimum Energy Performance
posted by  Hanh Truong  on 

Dear Sir, I am working on factory project which targets to reach a LEED 2009 certified level.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jul 11, 2017, 2:32 am

Multiple AHU's serving one zone

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Lavanya Veerappa  on 

Hi, I am working on C & S project wherein 4 AHU's are serving an entire office area per floor.

3
Director
Passive Dynamics Sustainability Consultants
LEEDuser Basic Member
12 thumbs up
Fri Jul 7, 2017, 5:33 pm

Energy Rates for CHP used Project

NC-2009 EAp2:Minimum Energy Performance
posted by  SAMY Chamy  on 

Dear All Our Project have CHP (2 CNG Generator 500Kw with VAM Chillier 100TR) what is rate we use for BASE Case and Design Case For Design case we use the Fuel(CNG) cost invested to run a Gener

5
Mon Jun 26, 2017, 1:24 pm

Controllability of lighting in Shared Area

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Jonathan Mak  on 

We are having a hotel project that would like to attempt this credit.

2
Thu Jun 22, 2017, 6:14 am

Energy Simulation Baseline

CS-2009 EAc1:Optimize Energy Performance
posted by  Yong Lee Low  on 

Hi, I am working on a office building of about 15,000sqm using AHU with underfloor system.

3
Default Avatar
ESD Consultancy
ZEB-Technology Pte Ltd
LEEDuser Basic Member
127 thumbs up
Tue May 30, 2017, 12:56 pm

Factory with a high unregulated energy loads- LEED EAp2

NC-2009 EAp2:Minimum Energy Performance
posted by  Hanh Truong  on 

Hello, I am a beginner in LEED. I have a question regarding to EAp2. I am recently preparing LEED certificate report for a factory.

3
Default Avatar
Green Building Consultant
Artelia
LEEDuser Basic Member
0 thumbs up
Fri Apr 7, 2017, 1:29 pm

Aerators use in water flow fittings

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Magda Aghababyan  on 

Hi, Currently we are working in a office project. For the aesthetic purposes the project owners has selected flow fittings which does not meet the LEED requirement.

2
Wed Apr 5, 2017, 9:01 am

Water use in a campus project

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Magda Aghababyan  on 

We are working on a LEED campus project which is going to be certified with one new construction building (will be certified LEED NC 2009) and some other buildings which are not going to be certifi

2
Wed Apr 5, 2017, 8:58 am