Exhaust Requirement
NC-2009 IEQp1:Minimum IAQ Performanceposted by SAMY Chamy on
I think this credit is for fresh air requirement. Is there any requirement for Exhaust rates, are they need to documented for this credit Our project have store rooms as per local Fire and safety
1
Mon Nov 2, 2015, 1:15 pm
Energy Rates for CHP used Project
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All Our Project have CHP (2 CNG Generator 500Kw with VAM Chillier 100TR) what is rate we use for BASE Case and Design Case For Design case we use the Fuel(CNG) cost invested to run a Gener
5
Mon Jun 26, 2017, 1:24 pm
Use of Table fans in Working Desk
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by SAMY Chamy on
Dear all Our production area is sewing machines so we install table fan with switches in every sewing table.
3