Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Exhaust Requirement

NC-2009 IEQp1:Minimum IAQ Performance
posted by  SAMY Chamy  on 

I think this credit is for fresh air requirement. Is there any requirement for Exhaust rates, are they need to documented for this credit Our project have store rooms as per local Fire and safety

1
Mon Nov 2, 2015, 1:15 pm

Energy Rates for CHP used Project

NC-2009 EAp2:Minimum Energy Performance
posted by  SAMY Chamy  on 

Dear All Our Project have CHP (2 CNG Generator 500Kw with VAM Chillier 100TR) what is rate we use for BASE Case and Design Case For Design case we use the Fuel(CNG) cost invested to run a Gener

5
Mon Jun 26, 2017, 1:24 pm

Use of Table fans in Working Desk

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  SAMY Chamy  on 

Dear all Our production area is sewing machines so we install table fan with switches in every sewing table.

3
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Fri Jan 8, 2016, 6:15 pm