Forum quick links
v2009: Design Submittal doubts
posted by Victoria Rios Esteve on
Hi everyone! We have a project which is registered to be certified with v2009. We haven't done Preliminary Design Submittal yet and we are aware of v2009 sunset on June 30.
WC flushing valves to be adjusted manually
NC-v4 WEc2:Indoor water use reductionposted by Victoria Rios Esteve on
Hi everyone! On our project, we have installed wc flushing valves that can be manually adjusted to gain higher water use reduction. This is specified in manufacturer's catalogue.
LTc5 - Access to Quality Transit - Awarded Credit - obtain more points
NC-v4.1 LTc5:Access to Quality Transitposted by A&L SUSTENTABILIDADE on
During the Design Review, we have submitted the LT credit Access to quality transit, and we have earned 4 out of 5 points (LEED v4.1).
90.1 Section 8.4.2 Automatic Receptacle Control for 220 volts systems
CI-v4 EAp2:Minimum energy performanceposted by Agustin Bertolotti on
Hi Everyone
We have a Project in a location where the electric supply is in 220 volts.
Manual controls - remote control device
NC-v4 EQc6:Interior lightingposted by A&L SUSTENTABILIDADE on
The EQ credit Interior Lighting – Option 1 - Lighting Control states that “switches or manual controls must be located in the same space as the controlled luminaires.
Integrated Pest Management
Pilot-Credits SSpc82:Local food productionposted by Adriana Hansen on
Hi everyone!
Sidewalks width
ND-Plan-v4 NPDp1:Walkable streetsposted by Gabriela Mesquita on
Hello, I have a query.
In the Walkable Streets Prerequisite, specifically at point C.
Performance Targets on Policies
EBOM-v4.1 MRp1:Purchasing Policyposted by Sofia Barahona on
We are currently working on the LEED O+M v4.1 certification of a project, and we have some doubts regarding some prerrequisites that requires the development of policies.
BD+C vs ID+C Rting System Selection
Retail-CI-v4 MPR2:Must use reasonable LEED boundariesposted by Sofia Barahona on
We are working on a Retail (fast food store) that is currently in the LEED registration process.
BD+C vs ID+C Rating System Selection
Retail-CI-v4 MPR2:Must use reasonable LEED boundariesposted by Sofia Barahona on
We are working on a Retail (fast food store) that is currently in the LEED registration process.