Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

v2009: Design Submittal doubts

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Victoria Rios Esteve  on 

Hi everyone! We have a project which is registered to be certified with v2009. We haven't done Preliminary Design Submittal yet and we are aware of v2009 sunset on June 30.

0

WC flushing valves to be adjusted manually

NC-v4 WEc2:Indoor water use reduction
posted by  Victoria Rios Esteve  on 

Hi everyone! On our project, we have installed wc flushing valves that can be manually adjusted to gain higher water use reduction. This is specified in manufacturer's catalogue.

1
Fri May 13, 2022, 10:32 pm

LTc5 - Access to Quality Transit - Awarded Credit - obtain more points

NC-v4.1 LTc5:Access to Quality Transit
posted by  A&L SUSTENTABILIDADE   on 

During the Design Review, we have submitted the LT credit Access to quality transit, and we have earned 4 out of 5 points (LEED v4.1).

0

90.1 Section 8.4.2 Automatic Receptacle Control for 220 volts systems

CI-v4 EAp2:Minimum energy performance
posted by  Agustin Bertolotti  on 

Hi Everyone

We have a Project in a location where the electric supply is in 220 volts. 

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Mar 24, 2022, 8:42 pm

Manual controls - remote control device

NC-v4 EQc6:Interior lighting
posted by  A&L SUSTENTABILIDADE   on 

The EQ credit Interior Lighting – Option 1 - Lighting Control states that “switches or manual controls must be located in the same space as the controlled luminaires.

1
Fri Feb 25, 2022, 1:15 pm

Sidewalks width

ND-Plan-v4 NPDp1:Walkable streets
posted by  Gabriela Mesquita  on 

Hello, I have a query.
In the Walkable Streets Prerequisite, specifically at point C.

0

Performance Targets on Policies

EBOM-v4.1 MRp1:Purchasing Policy
posted by  Sofia Barahona  on 

We are currently working on the LEED O+M v4.1 certification of a project, and we have some doubts regarding some prerrequisites that requires the development of policies.

0

BD+C vs ID+C Rting System Selection

Retail-CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Sofia Barahona  on 

We are working on a Retail (fast food store) that is currently in the LEED registration process.

2
Sustainability Consultant
Thornton Tomasetti
LEEDuser Expert
3 thumbs up
Thu Jan 6, 2022, 11:45 am

BD+C vs ID+C Rating System Selection

Retail-CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Sofia Barahona  on 

We are working on a Retail (fast food store) that is currently in the LEED registration process.

0