Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED v5 Pilot Credits

EBOM-v5 PRc1:Project Priorities
posted by  Srecko Curkovic  on 

Does anyone have more information on pilot credit registration requirements for LEED v5? Thank you!

0

IEQc4.1 Required information

NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Victoria Rios Esteve  on 

Hi everyone! 

I´m pretty new at LEED certification process, so I will really appreciate your help. 

3
Mon May 11, 2026, 4:37 pm

Documentation for Inherently non-emitting materials

NC-v4 EQc2:Low-emitting materials
posted by  Edgar Arevalo  on 

We have an insulation material that can comply either as inherently non-emitting or meets general emissions evaluation, and has been checked as inherently non-emitting by the contractor,

11
Mon May 11, 2026, 4:09 pm

What is the Process for BIS CRS Registration?

LEED Exam Discussion
posted by  Bl India  on 

BIS CRS Registration is required for many electronic and IT products before they can be marketed in India.

0

Leak detection based on water meter

Pilot-Credits WEpc153:Water Leak Detection and Monitoring
posted by  Michaël Briffaz  on 

Hey,

The credit languages is stating to "Install water sensors connected to a local network internet BMS or metering solution on water using subsystems."

3
Thu May 7, 2026, 6:26 am

Baseline of existing building with major renovation

NC-v4.1 EAp2:Minimum Energy Performance
posted by  Mike Mentzos  on 

According to ASHRAE 90.1-2010 Table G3.1.5 (f) for existing building envelopes, the baseline building design shall reflect

3
Mon May 4, 2026, 11:55 am

Get Your ISI Mark Certification Quickly with Expert Guidance

LEED Exam Discussion
posted by  Bl India  on 

Brand Liaison is a trusted consultancy firm providing expert assistance for ISI Mark certification in Indi

0