Hi everyone, seeking feedback on the realistic total point yield across WE, EA, IN, and MR for an automated, pre-commissioned and non-hazardous process water treatment skid on a Data Center project (replacing conventional acid/biocide dosing). Field data from a recent Data Center site expansion showed an increased cooling tower CoC from 3 to 5 (with equal or higher expected on new builds), a +2% heat exchanger efficiency gain via scale and biofilm control, and a chemical-free blowdown discharge (zero sulfates, chlorides, or biocide residuals) that simplifies environmental permitting.