Forum quick links
Option 1: Disadvantaged Community
NC-v4.1 LTc3:High Priority Site and Equitable Developmentposted by Neil Rosen on
There is a significant discrepancy between the information provided on census tract versus that of state government. There is a NYS Disadvantaged Communities website that clearly indicates th
Strategy 7. Operable Windows - ASHRAE 62.1-2016 for windows location
NC-v4.1 EQc1:Enhanced Indoor Air Quality Strategiesposted by MAUDE PINTAL on
Hello
3rd Party Verified Manufacturer Inventory & Product Lens?
NC-v4.1 MRc4:Material Ingredientsposted by Katrina Kashinejad on
Hello,
I'm looking for confirmation on what counts as 3rd Party Verification for these two types of Material Ingredient Reports:
Documentation after EPD threshold reached
NC-v4.1 MRc2:Environmental Product Declarationsposted by Andrea Vickers on
Hi - I thought I had found somewhere that LEED requires you to continue counting products with EPDs (applies to HPDs/materials ingredients as well) even after you reach the threshold targ
Chlorine Flush vs. IAQ Assessment
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Mike Bahr on
Has anyone here done an IAQ assessment around the same time as a chlorine flush of the domestic water system and plumbing fixtures?
Change of space during performance period
EBOM-v4.1 EQp1:Minimum Indoor Air Qualityposted by Pulak Goyal on
I have a building going for LEED O+M v4.1 Existing Buildings Certification.
(mis)Understanding the LEED Review (and appeal) process
posted by Susannah Goddard on
We have recently undergone the Final Design Stage Review and have some credits 'denied'.
Bird glazing that meets quality views credit requirements
NC-v4 EQc8:Quality viewsposted by Blake Weaver on
I have an owner that is interested in installing bird glazing for their Airport project. We are pursuing the quality view credit which somewhat limits our options for bird safe glazing.
Baseline HVAC, Non-regulated loads and Exceptional Calculation Method for V4.1
NC-v4.1 EAp2:Minimum Energy Performanceposted by on
A 156,000 SF pharmaceutical production facility wants to pursue LEED v4.1. Building breakdown as follows:
Meeting the credit intent
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Jon Hall on
The credit intent states the following: Encourage any and all members of the project team to promote and further social equity by integrating strategies that address identified social and economic