Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

expected volume

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Richardson Jean-Baptiste  on 

Hello all How would one know the expected volume for a building, as well as the frequency of collection for a new project? Can one reference a similar building (similar in s.f.

5
Default Avatar
Ms.
Tau Innovative Solutions
LEEDuser Basic Member
4 thumbs up
Thu Jun 28, 2018, 1:01 pm

Flexible Power Distribution

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  roma goyal  on 

Hello,

I would like to know e=waht does 'flexible power distribution i.e. plug and play system' mean?

what are the equipments to be considered for this system?

1
Wed Aug 22, 2018, 10:50 pm

Lighting Power Density for berth and roadway areas - space by space method

NC-v4 EAp2:Minimum energy performance
posted by  Dionisio Franca  on 

I'm working with a large scale multi-floor distribution center and trying to determine the correct LPD - lighting power densities of the berths and vehicle paths.

1
Thu Jun 28, 2018, 1:39 pm

Introduction

Green Commons
posted by  Jeff Geisinger  on 

Hi all, 

7
Wed Jun 27, 2018, 4:11 pm

Construction Phases

Hospitality-NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Larissa Murakami  on 

We have a project to be registered in LEED NC for hotels. The project consists of several towers and some units of chalets.

1
Fri Jun 29, 2018, 1:24 am

Can anyone share approach taken to comply with this or related Certified Multi-attribute Products and Materials?

Pilot-Credits MRpc103:Integrative Analysis of Building Materials
posted by  Panu Pasanen  on 

Hi, this looks pretty demanding spec, as the related "Certified Multi-attribute Products and Materials".

2
Wed Jun 27, 2018, 3:07 pm

Pilot credit - Building Material Human Hazard & Exposure Assessment

Retail-CI-v4 INc1:Innovation
posted by  Stacey Olson  on 

It appears that using 5 products which have Declare Labels and/or which are listed on the Pharos site would satisfy the requirements of this credit. Can you please confirm.

Thanks,

0

Preliminary and Final Design Review Submission - Online Steps for Final Design Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Stephen Sgro  on 

We received our preliminary design review report. All credits that were pending and ones requiring revisions have been revised and additional documents have been uploaded.

1
Wed Jun 27, 2018, 1:29 pm

CALGreen certification as alternate to Watersense?

CI-v4 WEp1:Indoor water use reduction
posted by  Paladino "Team"  on 

Would GBCI accept a plumbing fixture that is CALGreen certified as an alternative compliance path to the Watersense requirement?

3
Sustainability Associate
Urban Fabrick, Inc.
LEEDuser Basic Member
7 thumbs up
Tue Jun 26, 2018, 7:17 pm