"Include team members whose capabilities include at least three of the following skill sets:"
LEEDuser’s viewpoint
Explore this LEED credit
Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Option 1. Integrative project team (1 point)
Assemble and involve a project team to meet the three criteria below: a) Include team members whose capabilities include at least three of the following skill sets:- architecture or residential building design;
- mechanical or energy engineering;
- building science or performance testing;
- green building or sustainable design; and
- civil engineering, landscape architecture, habitat restoration, or land-use planning.
- conceptual or schematic design;
- LEED planning;
- preliminary design;
- energy and envelope systems analysis or design;
- design development;
- final design, working drawings or specifications; and
- construction.
AND/OR
Option 2. Design charrette (1 point)
No later than the design development phase and preferably during schematic design, conduct at least one full-day workshop (or two half-day workshops) with the project team, as defined in Option 1. Use the workshop to integrate green strategies across all aspects of the building design, drawing on the expertise of all participants.AND/OR
Option 3. Trades training (1 point)
Before construction but after trades have been hired for the project, conduct at least eight hours of training (extending a full day or over several days) on the green aspects of the project and how the trades can contribute to achieving each LEED for Homes prerequisite and attempted credit. Focus on areas where trades have traditionally struggled to meet green building standards. Include at least the following trades in the training:- plumbing;
- mechanical systems;
- insulation;
- framing; and
- air sealing.
What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
See all forum discussions about this credit »Addenda
"Include team members whose capabilities include at least three of the following skill sets:"
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Option 1. Integrative project team (1 point)
Assemble and involve a project team to meet the three criteria below: a) Include team members whose capabilities include at least three of the following skill sets:- architecture or residential building design;
- mechanical or energy engineering;
- building science or performance testing;
- green building or sustainable design; and
- civil engineering, landscape architecture, habitat restoration, or land-use planning.
- conceptual or schematic design;
- LEED planning;
- preliminary design;
- energy and envelope systems analysis or design;
- design development;
- final design, working drawings or specifications; and
- construction.
AND/OR
Option 2. Design charrette (1 point)
No later than the design development phase and preferably during schematic design, conduct at least one full-day workshop (or two half-day workshops) with the project team, as defined in Option 1. Use the workshop to integrate green strategies across all aspects of the building design, drawing on the expertise of all participants.AND/OR
Option 3. Trades training (1 point)
Before construction but after trades have been hired for the project, conduct at least eight hours of training (extending a full day or over several days) on the green aspects of the project and how the trades can contribute to achieving each LEED for Homes prerequisite and attempted credit. Focus on areas where trades have traditionally struggled to meet green building standards. Include at least the following trades in the training:- plumbing;
- mechanical systems;
- insulation;
- framing; and
- air sealing.