Thank you for all of the information provided on this forum. I am confident in all of our calculations up to the Storm Interval and Drawdown calculations. If I understand things correctly, the calculations are fairly simple: Example Storm volume: 119,000 liters Storage Capacity: 148,000 liters Dawdown Rate (reuse): 2,300 liters/day Storage + (drawdown x 3 days) - Storm volume = capacity remaining (or runoff) Storm 1 148,000 + 6,900 - 119,000 = 35,900 storage remaining after three days. Storm 2 Storm volume - Capacity remaining - drawdown (1 day) = Runoff 119,000 - 35,900 - 2,300 = 80,800 liters of runoff (post-dev) Assuming a fairly impervious Pre-dev site condition let´s assume a calculated runoff of 115,000 liters per 2 year 24 hour storm: Pre-dev runoff: 115,000 liters Post-dev runoff: 80,800 liters Runoff reduction: 34,200 liters Runoff reduction: 30% Is it that easy? Am I missing something? Thank you!
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.