Forum quick links
CDPH v1.2-2017 using a Classroom Environment, for BD+C: Schools
Schools-NC-v4.1 EQc2:Low-Emitting Materialsposted by Cam Burkacki on
Hi all,
LEED v4.1 O+M, Energy and Atmosphere - Energy Performance - Arc Platform - CHP
EBOM-v4.1 EAp3:Energy Performanceposted by Flotra Stamm on
We have a question regarding filling out the data information in ARC platform for a CHP. It produces heat (natural Gas) and electricity.
Hand-washing faucets in Classrooms or Cafeteria
Schools-NC-v4 WEp2:Indoor water use reductionposted by Danielle Waters on
We have an Elementary project confused whether to specify low-flow on Classroom faucets and 'hand wash' faucet in Cafeteria prep area.
Test and balance
NC-v4 EAc1:Enhanced commissioningposted by Heather Holdridge on
I understand that there were not any requirements regarding TAB in LEED 2009 -- is this still true for v4? Just want to confirm that there are no issues with having the balancer contracted un
Flush-out of a Modular Building
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Neil Rosen on
If I am fabricating the building off-site in modules and assembling those modules on-site, can I perform the flush-out in the factory?
Contractor's Commitment reporting template--in progress
posted by Candace Pearson on
Hello all,
UPS rooms for LEED
CS-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi, I am working on a Data Center and I am confused if we should model UPS rooms for LEED and what schedule should I use since its a backup supply room incase the power goes .
Modeling UPS Room for Data Center
NC-2009 EAp2:Minimum Energy Performanceposted by Rajat Wadhwa on
Hi, I am working on a Data Center and I am confused if we should model UPS rooms for LEED and what schedule should I use since its a backup supply room incase the power goes .
UPS rooms for LEED
NC-2009 EAp2:Minimum Energy Performanceposted by Rajat Wadhwa on
Hi, I am working on a Data Center and I am confused if we should model UPS rooms for LEED and what schedule should I use since its a backup supply room incase the power goes .