Forum quick links
Approved Bicycle Storage
NC-v4 LTc6:Bicycle facilitiesposted by Summer Minchew on
I read and understand the USGBC guidance regarding the selection of bike racks, that “Bicycle racks should reflect best practices in design and installation.
2 rooms
CS-2009 MRp1:Storage and Collection of Recyclablesposted by gabriel Morales on
Hi, in our project we have reduced the complexity of the land areas, this has affected garbage have 2 rooms on the same level with easy vehicular access for trash removal.
Formaldehyde Emissions Evaluation Requirements
CI-v4.1 EQc2:Low Emitting Materialsposted by Rosa Cheney on
We are looking at the formaldehyde emissions evaluations requirements for v4.1 (pasted below) compared to v4. We found it odd that the third bullet point references both a European (EN 717-1:
Public lavatory (restroom) faucet water sense?
CI-v4 WEp1:Indoor water use reductionposted by Carlos Dobobuto on
Hi, we are looking for a Public lavatory (restroom) faucet with water sense label but all we have found have higher consuption that the base line.
PIf2 Site Characteristics for individual building project on a LEED Campus
Schools-2009 PIf2:Project Summary Detailsposted by Yasha Ogg on
I have a project that is getting built in two phases on a LEED Campus. The first phase includes the construction of a new 3-8 grade building.
How long after a project is completed can credits be submitted?
Healthcare-v4 INc1:Innovationposted by Stephanie Kreps on
If a new construction project is already registered in LEED online, can the credit submittal process begin after the building has been completed?
Trellis in Vegetated Area
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Summer on
I'm working on a project with an open space and vegetated area compliant to the credit requirement.
Are Shades 'Furniture and Furnishings'?
CI-v4 EQc2:Low emitting materialsposted by Julie Hendricks on
Motorized and manual shades (such as Mechoshade) are in Division 12. Do they count as "stand-alone furniture items" that must be included in low-emitting materials calculations?
Update information for previously awarded credits
posted by Silvia Ruiz on
Our project got back the Final Design Review, but changes that affect one Awarded credit occurred during construction.