Skipping the IAQ Assessment for CO2 and TVOC
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Maysoon Al-Khuraissat on
The requirements in the LEED v4.1 Guide for the v4.1 EQP4- Indoor Environment Quality Performance says: (Conduct an occupant satisfaction survey and/or an indoor air quality evaluation.).
Integrative Design - When does it work and when does it not?
posted by James Petersen on
Green Gurus,
We'd love your feedback.
LEED Grid Optimal Building ACP
posted by Cory Duggin on
Has anyone submited this credit in lieu of demand response before? I'm attempting on multiple projects but not sure what to expect review wise or how much confidence to have in the ability to
Purchasing Calculator
EBOM-v4.1 MRc1:Purchasingposted by Alejandro Cobos on
Hello! I could only find a Purchasing calculator for LEED EBOM v.4. Is there a new one for v4.1 or the version v4 is still valid?
Eligible subsystems for option 3 in v4.1
CS-v4.1 WEc3:Optimize Process Water Useposted by Landry Watson on
Option 3 discusses reduction in process water through non-potable water sources. Then goes on to define elible systems as...(from ref guide)
SMEPL Monthly Call next Tuesday at 2:00pm ET!
posted by Amanda Farman on
Hi MEP Leaders,
Just a reminder that our monthly meeting is next Tuesday, May 9th, at 2:00pm ET. All SMEPL network members are invited to join!
Site Assessment on an existing site
Warehouses-NC-v4 SSc1:Site assessmentposted by Sofia Barahona on
We are currently working on a warehouse project that is an extention of an existing warehouse.
Calculations for demountable partitions
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Marie Miller on
I'm working on a TI project and we're trying to get the Design for Flexibility point. When calculating for this credit, do we use linear feet or square feet of the product?
Group approach - Minimum requirement compliance
NC-v4 EAp2:Minimum energy performanceposted by Luis Andrade on
Hello everyone!
I am working on 2 buildings that are registered in one project following the group approach.