Excluded requirement of indoor door matt in a tenant space for a CS project?
CS-v4.1 EQc1:Enhanced Indoor Air Quality Strategiesposted by Maria Nordberg on
Our project is trying to implement the credit EQc1 but are having issues regarding entryway system in entrances to our smaller tenants.
Energy and Atmosphere
NC-v4 EAp2:Minimum energy performanceposted by PURUSHOTHAMAN on
Dear LEED Experts...
Lighting in unconditioned exterior concourses
NC-2009 EAp2:Minimum Energy Performanceposted by Judhajit Chakraborty on
I am working on a stadium project where the main concourses are exterior and tucked under the seating bowl; within the concourse are restrooms, concessions, etc.
Skipping the IAQ Assessment for CO2 and TVOC
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Maysoon Al-Khuraissat on
The requirements in the LEED v4.1 Guide for the v4.1 EQP4- Indoor Environment Quality Performance says: (Conduct an occupant satisfaction survey and/or an indoor air quality evaluation.).
Purchasing Calculator
EBOM-v4.1 MRc1:Purchasingposted by Alejandro Cobos on
Hello! I could only find a Purchasing calculator for LEED EBOM v.4. Is there a new one for v4.1 or the version v4 is still valid?
Eligible subsystems for option 3 in v4.1
CS-v4.1 WEc3:Optimize Process Water Useposted by Landry Watson on
Option 3 discusses reduction in process water through non-potable water sources. Then goes on to define elible systems as...(from ref guide)
Site Assessment on an existing site
Warehouses-NC-v4 SSc1:Site assessmentposted by Sofia Barahona on
We are currently working on a warehouse project that is an extention of an existing warehouse.
Calculations for demountable partitions
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Marie Miller on
I'm working on a TI project and we're trying to get the Design for Flexibility point. When calculating for this credit, do we use linear feet or square feet of the product?