Log in
Forum » Czech Republic
Topic

Buildings with different uses under one group certification?

LEED Rating System Selection
posted by Barbora Cicvárková on May 13, 2020, 7:23 am

Hi to all,

please, I have a question about registration. We have a project that consists of five sections, of which four will be offices (Core and Shell approach) and - newly - one section...

Last reply: Barbora Cicvárková, May 14, 2020, 3:48 am

Sauna ventilation

NC-v4 EQp1: Minimum indoor air quality performance
posted by Frantisek Macholda on Nov 25, 2019, 9:49 am

Hello,

we have a sauna in our LEED v.4 NC project in Europe. Do you have any idea how to comply with minimum...

Open-grid pavement- does it contribute to SSc7.2?

CS-2009 SSc7.2: Heat island effect - roof
posted by Barbora Cicvárková on Sep 9, 2019, 8:19 am

Hello,

I would like to kindly ask, if the open-grid pavement contributes to...

Last reply: Barbora Cicvárková, Sep 16, 2019, 8:44 am

Charging station capacity- Option 2 Electric vehicles

CS-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Frantisek Macholda on Mar 21, 2018, 6:11 am

Dear all,

developer decided to meet the requirement via option 2- installing electric charging station at our project. The requirement of 3% of total parking capacity equipped with...

Last reply: Edgar Arevalo, Aug 8, 2019, 4:04 pm

not unreasonably exclude space... must distinguish from any non-certifying space... Complete building or space MPR in disguise?

CS-v4 MPR2: Must use reasonable LEED boundaries
posted by Ward Miller on Aug 7, 2019, 12:39 pm

Maria & Merve - great questions! Nobody appears to be daring to comment on the issues related to the old LEEDv2009 MPR #2 - Must be a complete building or space, which had two editions of two...

Last reply: Tristan Roberts, Aug 7, 2019, 10:48 pm

Connection with WELL

Pilot-Credits EQpc123: Designing with Nature, Biophilic Design for the Indoor Environment
posted by John Bello on Mar 19, 2019, 5:51 am

I think a good option for this credit would be to include a section where affiliated WELL credits can be referenced and merited accordingly.

Last reply: Taurus Yu, Jun 28, 2019, 3:48 am

Water-less Cooling Tower

CS-v4.1 WEc3: Cooling Tower and Process Water Use
posted by John Bello on Apr 12, 2019, 6:25 am

Our cooling system does not use any water. Instead we are planning to use a R410-a refrigerant. Would this classify for full compliance with Option 2 or Option 3. Also, if we manage 20% of our...

All year round shaded area

CS-v4 SSc5: Heat Island Reduction
posted by Frantisek Macholda on Mar 19, 2019, 10:12 am

Hi, we have a square atrium in the middle of the building. The floor of the atrium is 30 meters below the level of the roof of the building but it should be classified as a roof construction...

Multiple buildings

LEED Rating System Selection
posted by Markéta Vagenknechtová on Aug 14, 2018, 5:28 am

Our client wants to certify a complex of three new industrial buildings. Which rating system should we use? Can be three buildings certified as one project? I guess it should be BD+C: New...

Last reply: David Eldridge, Sep 5, 2018, 10:18 pm

Which Option 2 strategies for a warehouse hall?

Warehouses-NC-v4 EQc6: Interior lighting
posted by Frantisek Macholda on May 11, 2018, 3:38 am

Hello,

what 4. strategy would you see as possible for a warehouse hall consisting of dry storage, cooled storage and frozen part? It is considered as a regularly occupied space. Strategies...

Last reply: Kera Lagios, Jun 29, 2018, 6:15 pm