Green Cleaning no longer an option?NC-v4 INc1: Innovationposted by emily reese moody on Jan 25, 2018, 6:27 pm
Hi all, I was just looking for the criteria for Green Cleaning for my v4 NC project, but do not see it listed on USGBC in neither the Innovation Catalog, nor the Pilot Credits. I double-... Last reply: Jackson Ludwig, Oct 18, 2021, 6:06 pm |
|
New v4.1 appendix 4 Table 1, Base Ratios for Parking missing?NC-v4.1 LTc7: Reduced parking footprintposted by Adolfo Silva on Jan 5, 2021, 8:41 amnot have Appendix 4 (or Appendices 2 and 3, for that matter). Does anyone know where these are posted? My Google search led me to this forum. Log in or register to post comments Dave Hubka Practice Leader-... Last reply: Dave Hubka, Oct 18, 2021, 4:44 pm |
|
modelling and presenting GSHP resultsNC-v4 EAp2: Minimum Energy Performanceposted by Manuel Martin Delgado on Oct 14, 2021, 11:06 am
Hi, I am working on a building that includes GSHP to cover part of the heating and cooling load. Normally, due to software constrains, we tend to just use excel calculators to predict the... Last reply: Jamy Bacchus, Oct 18, 2021, 3:23 pm |
|
LEEDv4 project that upgraded this credit to 4.1 but would like to downgrade back to LEEDv4 for this creditNC-v4.1 MRc2: Environmental Product Declarationsposted by Summer Gorder on Oct 7, 2021, 6:31 pm
I have a LEEDv4 that has upgraded some MR credits to LEEDv4.1 that I would like to put back as LEEDv4. Can you go back once you have upgraded? Last reply: Bipin Karki, Oct 18, 2021, 11:31 am |
|
Is Zone Outdoor Airflow meets or exceeds for all zones required?NC-v4 EQp1: Minimum indoor air quality performanceposted by Justin Shultz on Jun 18, 2021, 9:18 am
We are working with a "Dayroom" space that has the following requirements: 4... Last reply: Afogreen Build, Oct 18, 2021, 12:31 am |
|
Using Short Term Bike Parking under local city requirements as LEED Long term parkingNC-v4.1 LTc6: Bicycle facilitiesposted by Jody Lee Potvin-Jones on Sep 16, 2021, 6:55 am
Hello, I have a question about the short-term bike parking. So according to our occupancy calculations, we need only 8 short-term bike parking on the site. But, to fulfill the local city... Last reply: Afogreen Build, Oct 18, 2021, 12:29 am |
|
Attempting this Pilot as a Parksmart project InnovationPilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by Joanna Switzer on May 10, 2019, 12:00 pm
Using the same approach I found successful on prior LEEDv4 projects (use of three Sherwin William's products with Manf prepared IABM compliance documentation), I am attempting to cross-reference... Last reply: Christian Mayer, Oct 15, 2021, 9:50 am |
|
Environmental Management SystemsLEED v4.1 Discussion Forumposted by Jesse Schildt on Oct 15, 2021, 8:12 am
I’m a student researching the perceptions of US construction professionals on the implementation of environmental management systems in construction. The idea is to explore the benefits... |
|
MERV 8 upstream cooling coilsEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Paula Hernandez on Oct 12, 2021, 3:24 pm
Hi, We are working in an... Last reply: Paula Hernandez, Oct 14, 2021, 6:19 am |
|
INpc136- Daily Journal Further SpecificationsPilot-Credits INpc136: Safety First: Re-Enter Your Workspaceposted by Frida Villa on Sep 22, 2021, 3:36 pm
Is there a requirement/recomendation on how long the daily survey needs to be applied for? The requirements under the credit are not very specific when it comes to the daily journal, what do you... Last reply: Vladimir Mota, Oct 13, 2021, 9:22 pm |