Log in
Forum
Topic

What are the mandatory major renovation activities that must be done to qualify for LEED NC for an existing building?

LEED Rating System Selection
posted by Dina El-Sady on Feb 25, 2020, 7:22 am

A building undergoing major renovation including HVAC and electric systems ,window replacements and interior changes but the exterior wall will only be painted ?Does it qualify for LEED NC?

Last reply: Dave Hubka, Jun 5, 2023, 3:46 pm

Healthcare renovation

LEED v4.1 Discussion Forum
posted by Denise Thompson on May 6, 2021, 7:49 pm

Hi, we're renovating 2 of the floors of an ...

Last reply: Nadia Azzam, Jun 5, 2023, 1:40 pm

What requirements apply to the big (over 8cu ft capacity) washing machines used for onsite laundry of bedding and towels?

Hospitality-NC-v4 WEc2: Indoor water use reduction
posted by Glen Boldt on Jun 3, 2023, 3:33 am

Per the EPA /Energy Star definition, the commercial washing machines are coin or card operated types for use by multiple residents of a building - this is similar to the situation for hotel...

Parking Generation 4th edition

Help Wanted: LEED-related Jobs
posted by Rasha Ameer on Jun 2, 2023, 2:17 pm

Hello everyone,

Can someone please check if the 4th edition parking generation has General Office Building? I found it in the list but not in the figures. Can anyone help solve my problem...

Advanced Metering NC Space Exemptions

NC-v4 EAc3: Advanced Energy Metering
posted by Alexandra Markus on Jun 1, 2023, 1:45 pm

I'm working on a recreation center project that includes a daycare. The daycare space will not be fit-out as part of the project. From my understanding, we can exclude a small portion of the...

Last reply: Marcus Sheffer, Jun 2, 2023, 1:32 pm

Manufacturing building extension

LEED Rating System Selection
posted by Robert Yates on Jun 2, 2023, 10:36 am

I'm trying to figure out the best LEED version to use for an extension of an existing manufacturing building. It has not yet been determined if it will be open to the existing building (no walls...

Last reply: Dave Hubka, Jun 2, 2023, 11:15 am

IAQ Testing Protocol for LEED and Living Building Challenge

NC-v4.1 EQc4: Indoor air quality assessment
posted by Dane Andersen on Jun 2, 2023, 11:11 am

Hello,

Does anyone know if the air testing protocol for the Living Building Challenge Healthy Interior Performance is acceptable to meet LEED Air Testing requirements? I am hoping to avoid...

Part of building certification

NC-v4.1 MPR2: Must use reasonable LEED boundaries
posted by Robert Yates on Jun 2, 2023, 10:39 am

I am looking to certify only part of a manufacturing building, which will be a newly built extension. In doing so, I'm wondering about where I should put my LEED boundary. Should it include any...

Bathtubs

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Agnieszka Rylska on Apr 28, 2015, 8:41 am

Dear All,
Our project is a high-class hotel. We are checking the compliance with WEp1 but we can't find what is the baseline for bathtubs.
Can we assume that tub is the same fixture...

Last reply: Maria Adelle Puse, Jun 1, 2023, 11:42 pm

Does LEED BD+C V4.1 is eligible precertification?

LEED Rating System Selection
posted by Ayesha Syeda on Jul 4, 2021, 9:25 pm

May I know if LEED BD+C v4.1 is eligible for recertification? If so please share the checklist.

Last reply: Elisabetta Spinozzi, Jun 1, 2023, 1:31 pm