Topic | Recent |
---|---|
Green Building Education- Educational Outreach Program vs. Guided TourNC-v4 INc1: Innovationposted by Katy Keene on Feb 17, 2020, 8:12 am
For our project, we are planning on selecting the below two options:
Last reply: emily reese moody, Jun 28, 2023, 9:23 pm |
|
Is pc98 required to earn pc99?Pilot-Credits IPpc99: Design for Enhanced Resilienceposted by Elizabeth Powers on Feb 12, 2020, 7:01 pm
Can someone clarify if a project needs to have performed the hazard assessment in pilot credit 98 and during pre-design, in order to be eligible for this pilot credit, or does this pilot credit... Last reply: Allison Smith, Jun 28, 2023, 7:01 pm |
|
Ride Share vs Car Share // Alternative Compliance and/or EquivalencyND-v4 NPDc8: Transportation demand managementposted by Matthew VanSweden on Jun 28, 2023, 4:40 pm
In 2023, the availability of ride-share platforms (i.e., Uber and Lyft) has made some early market car-sharing platforms obsolete (i.e., ZipCar and others). Yet, I see in the LEED-ND v4 credit... Last reply: Eliot Allen, Jun 28, 2023, 6:05 pm |
|
Exterior doors/windows in v4.1NC-v4.1 EQc2: Low-emitting materialsposted by Emily Purcell on Jan 5, 2021, 2:36 pm
Hi all, I'm looking at this past thread on the v4 Low-Emitting credit and how to account for exterior doors: ... Last reply: Jennifer Kruse, Jun 28, 2023, 10:00 am |
|
Construction IAQ Management Plan during demolition phase?NC-v4 EQc3: Construction indoor air quality management planposted by Elizabeth Kertesz on Sep 1, 2018, 11:06 am
For a major renovation project, should we implement the... Last reply: Afogreen Build, Jun 27, 2023, 12:12 pm |
|
how can attachments (drawings, images) be sent in a CIR?NC-v4 IPc1: Integrative processposted by Sara BENLOUBA on May 25, 2023, 4:45 am
Dear Everybody, We would like to send a... Last reply: Afogreen Build, Jun 27, 2023, 12:08 pm |
|
TOD No Minimum for ParkingNC-v4 LTc7: Reduced parking footprintposted by Graham Linn on Jun 23, 2023, 8:00 pmwith the intent of the credit. There are a lot of posts in this forum asking what to do if the ITE reductions come in lower than the local zoning minimum, and "look for TOD incentives" is always part... Last reply: Graham Linn, Jun 26, 2023, 12:18 pm |
|
Renewable energyEBOM-v4.1 EAp3: Energy Performanceposted by SAMY Chamy on Jun 23, 2023, 9:16 am
Hi Team, We have received an inquiry from a large corporation with more than 20 buildings on the same campus that has 2.5 MW of solar on its roof and operates with net metering (... |
|
Creating Baseline building Shell based on ΑSHRAE 90.1-2010- proposed building walls with more than 40% of glassNC-v4 EAc2: Optimize Energy Performanceposted by Konstantina Kalliakoudi on Jun 16, 2023, 3:52 am
Hello to all LEED Users, My proposed building has following percentage of glass at each orientation: NE: 90% percentage of glass SE: 90% percentage of glass NW: 90%... Last reply: Konstantina Kalliakoudi, Jun 23, 2023, 4:20 am |
|
Insulation in Interior walls for Vault Spaces in Data CenterNC-v4 EAc2: Optimize Energy Performanceposted by Rajat Wadhwa on Jun 22, 2023, 4:47 pm
Hi Everyone, We are modeling A Data center and the internal walls forvault spaces have insulation in them because of high temperature in the data center vault spaces, Now I am... Last reply: Marcus Sheffer, Jun 22, 2023, 4:52 pm |