Log in
Forum
Topic

Pursuing Whole Project Pilot in residential buildings

Pilot-Credits WEpc115: Whole Project Water Use Reduction
posted by Paul Erlichman on Oct 4, 2023, 10:44 am

Hello,
I posed a similar question in the forum for the Optimize Proces Water Use credit, but I figured I would post an addendum of sorts in the pilot credit forum.

My initial...

Water source heat pump with cooling tower and boiler

CI-v4 EAc3: Advanced Energy Metering
posted by Gaston Michaud on Oct 3, 2023, 4:51 pm

Hi all!

We have a project located in a building that provides a water loop for each tenant to connect its water source heat pump.  This loop includes cooling towers and boilers to maintain...

Last reply: Marcus Sheffer, Oct 4, 2023, 9:24 am

Occupant comfort survey and transportation survey

EBOM-v4.1 EQp4: Indoor Environmental Quality Performance
posted by Jayaprasad ramamoorthy on Oct 4, 2023, 2:57 am

We are currently working on the prison project for LEED existing building certification. The main concern in this how to conduct occupant comfort survey and transportation survey for prison...

HAP Simultion

CS-v4 EAp2: Minimum Energy Performance
posted by Nagaraj Sankar on Oct 4, 2023, 12:03 am

Hi,

We are planning to conduct an HAP Energy Simulation for a Core and Shell office building, but we are currently facing confusion regarding the Interior Lighting Load and process...

Last reply: Marcus Sheffer, Oct 4, 2023, 9:09 am

95 percentile of precipitation data

CS-v4 SSc4: Rainwater management
posted by Marine Petrosyan on Oct 4, 2023, 7:37 am

Hi, All!

For the territory of our project, we have standardized data (by state), based on historical data. The data is given in monthly average and daily maximum per month. I am taking...

Can ground level landscape be classified as Nonroof Measures?

NC-v4.1 SSc5: Heat Island Reduction
posted by Antonio Poblete on Jul 18, 2023, 3:04 pm

Do areas with ground level landscape count towards any of the calculations? 

Also, I have area that is just ground, no landscape or hardscape is that excluded from the calculations?

Last reply: emily reese moody, Oct 3, 2023, 8:41 pm

Heat Island Reduction

NC-v4.1 SSc5: Heat Island Reduction
posted by Maria Gamero on Sep 18, 2020, 7:49 am

Our project has 85% of parking covered by the building, but on the roof we have a vegetated area and solar panels. In the credit of Heat Island Reduction can we opt for Option 1?

Last reply: emily reese moody, Oct 3, 2023, 11:48 am

Heat Island SRI + Shade

NC-v4.1 SSc5: Heat Island Reduction
posted by Cynthia Dehlavi on Jul 17, 2023, 12:45 pm

A couple question about SS Credit Heat Island Reduction - Non Roof Measures:

1. None of the materials we are using have been tested for...

Last reply: emily reese moody, Oct 3, 2023, 8:24 pm

Heat Island Reduction- Non-roof measures

NC-v4.1 SSc5: Heat Island Reduction
posted by Eslam Elshorbagy on May 24, 2023, 12:05 pm

Hello, 

To meet the credit, I want to ask if the mechanical and equipment rooms shouldn't be included (excluded) in the...

Last reply: emily reese moody, Oct 3, 2023, 8:19 pm

Artificial turf in Steep-sloped roof

NC-v4.1 SSc5: Heat Island Reduction
posted by weam baljoon on Sep 19, 2022, 9:18 am

Can anyone clarify for NC-v4.1 SSc5 Option 1 Roof and Non-Roof - if Steep-sloped roof is covered with Artificial turf (decretive finish) and the product is within the minimum solar reflectance...

Last reply: emily reese moody, Oct 3, 2023, 8:17 pm