Walkable Project Site Innovation credit applicable to a university campus building?

NC-v4 INc1: Innovation
posted by Darrah Jakab on Oct 18, 2023, 2:00 pm

I'm working on a higher ed building in a pedestrian-only area of campus that I believe would be a good candidate for this credit. Has anyone had sucess in achieving this credit for a college...

Last reply: Afogreen Build, Jan 11, 2024, 8:38 pm

View Type 1 with non-continuous window glazing

NC-v4 EQc8: Quality Views
posted by Edgar Arevalo on Jan 8, 2024, 4:53 pm

I have a library that has a reading area with windows surrounding all sides but are separate by the interior wall, which makes the glazing non-continuous.  The wall space between windows are...

Last reply: Edgar Arevalo, Jan 11, 2024, 1:46 pm

"Weighted sum of non-roof and roof measures" Issue

NC-v4 SSc5: Heat Island Reduction
posted by Edgar Arevalo on Jan 10, 2024, 10:48 am

Under the Summary of Heat Island Reduction Measures, the footnote says "Weighted sum of nonroof and roof measures must be greater than or equal to sum of project paving and...

Last reply: Edgar Arevalo, Jan 11, 2024, 12:43 pm

MERV Filters for PM 2.5

NC-v4 EQp1: Minimum indoor air quality performance
posted by Banu Banu on Oct 21, 2023, 8:41 am

Dear All, 

In our project we have Direct Evaporative coolers . It is a garment production building. In Evaporative coolers, usually the process is mixing of Air & water. 

So, if...

Last reply: Devendra Chaughule, Jan 11, 2024, 12:25 am

LEED Daylight Simulation Option1 with IES-VE

NC-v4 EQc7: Daylight
posted by Mahshid Sedighimoghaddam on Jan 10, 2024, 4:57 am

Hello everyone,

We are doing Daylight simulation with IES-VE software in compliance with LEED daylighting Option 1.

We know that it is required two sets of simulations with and...

Desiccant Wheel Modeling for Baseline case

NC-v4.1 EAp2: Minimum Energy Performance
posted by John on Jan 2, 2024, 8:19 am

I am working on a model which has Desiccant wheel in design case. Do we need to model desiccant wheel in baseline case as well? I dont see any section related to this in ASHRAE 90.1, however, in...

Last reply: John, Jan 10, 2024, 6:12 am

Thermal Comfort Control

NC-v4 EQc5: Thermal comfort
posted by Martin Maribo on Nov 3, 2023, 4:56 am

How can individual thermal comfort controls be achieved for individual workstations in an open office?

Last reply: Afogreen Build, Jan 9, 2024, 8:02 pm

Electricity with Demand Flexibility

Pilot-Credits EApc152: GridOptimal Building ACP
posted by Cory Duggin on Jan 13, 2023, 4:27 pm

What is the best way to determein any electricity with demand flexibility?  What should I input in the form if it is 0?  If I enter 0 it acts like all fields haven't been filled out, so I used 0....

Last reply: , Jan 9, 2024, 4:36 pm

Non Attainment Area (Project Location)

CS-v4 EQp1: Minimum indoor air quality performance
posted by Nagaraj Sankar on Oct 17, 2023, 6:05 am

1. It appears that we are encountering a persistent issue in our projects. Many of our projects are situated in Non-Attainment areas, and we are already using...

Last reply: Afogreen Build, Jan 8, 2024, 9:05 pm

CDWM- Recycling Facility Diversion Rate

NC-v4 MRp2: Construction and demolition waste management planning
posted by Preethi Sreeraj on Jan 6, 2024, 11:50 am

It is clear from the guidance that a project will need the diversion rate of the...