What is the best way to determein any electricity with demand flexibility? What should I input in the form if it is 0? If I enter 0 it acts like all fields haven't been filled out, so I used 0.1. I worry that it is counting improvement in that category towards my achievement of the second point in error.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Hi all,
We are pursuing this pilot credit instead of Demand Response and it has led to great discussions with the Owner about load shedding, acceptable thermal setpoints, etc. I am wondering if this pilot can be submitted/reviewed as a design review credit (rather than construction review as Demand Response typically is) since it seems the calculator/related documentation are more aligned with energy modeling work and Min/Optimize Energy Performance documentation. Has anyone inquired about this?
Hi Kelly,
We submitted the pilot credit in the Design phase, but the reviewer noted that it must be reviewed in the Construction phase as it is a pilot ACP for the Demand Response credit.
I hope this helps!
Are you able to get the electricity demand to zero with the demand flexibility strategies?
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.