Electricity with Demand Flexibility

What is the best way to determein any electricity with demand flexibility?  What should I input in the form if it is 0?  If I enter 0 it acts like all fields haven't been filled out, so I used 0.1.  I worry that it is counting improvement in that category towards my achievement of the second point in error.

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 10/03/2023 - 21:12

Hi all, We are pursuing this pilot credit instead of Demand Response and it has led to great discussions with the Owner about load shedding, acceptable thermal setpoints, etc. I am wondering if this pilot can be submitted/reviewed as a design review credit (rather than construction review as Demand Response typically is) since it seems the calculator/related documentation are more aligned with energy modeling work and Min/Optimize Energy Performance documentation. Has anyone inquired about this?

Tue, 01/09/2024 - 21:36

Hi Kelly,  We submitted the pilot credit in the Design phase, but the reviewer noted that it must be reviewed in the Construction phase as it is a pilot ACP for the Demand Response credit. I hope this helps!