Log in
Forum
Topic

how can attachments (drawings, images) be sent in a CIR?

NC-v4 IPc1: Integrative process
posted by Sara BENLOUBA on May 25, 2023, 4:45 am

Dear Everybody,

We would like to send a...

Last reply: Afogreen Build, Jun 27, 2023, 12:08 pm

TOD No Minimum for Parking

NC-v4 LTc7: Reduced parking footprint
posted by Graham Linn on Jun 23, 2023, 8:00 pm

with the intent of the credit. There are a lot of posts in this forum asking what to do if the ITE reductions come in lower than the local zoning minimum, and "look for TOD incentives" is always part...

Last reply: Graham Linn, Jun 26, 2023, 12:18 pm

Renewable energy

EBOM-v4.1 EAp3: Energy Performance
posted by SAMY Chamy on Jun 23, 2023, 9:16 am

Hi Team,

We have received an inquiry from a large corporation with more than 20 buildings on the same campus that has 2.5 MW of solar on its roof and operates with net metering (...

Creating Baseline building Shell based on ΑSHRAE 90.1-2010- proposed building walls with more than 40% of glass

NC-v4 EAc2: Optimize Energy Performance
posted by Konstantina Kalliakoudi on Jun 16, 2023, 3:52 am

Hello to all LEED Users,

My proposed building has following percentage of glass at each orientation:

NE: 90% percentage of glass

SE: 90% percentage of glass

NW:  90%...

Last reply: Konstantina Kalliakoudi, Jun 23, 2023, 4:20 am

Insulation in Interior walls for Vault Spaces in Data Center

NC-v4 EAc2: Optimize Energy Performance
posted by Rajat Wadhwa on Jun 22, 2023, 4:47 pm

Hi Everyone, 

We are modeling A Data center and the internal walls forvault spaces have insulation in them because of high temperature in the data center vault spaces, Now I am...

Last reply: Marcus Sheffer, Jun 22, 2023, 4:52 pm

Justification of usign the 9.6.2 Additional Power lighting in the Baseline Model

NC-v4.1 EAp2: Minimum Energy Performance
posted by Marc Maso on Jun 19, 2023, 12:22 pm

some post in this forum where the additional power has been defined as process load. For example:  https://leeduser.buildinggreen.com/forum/additional-interior-lighting-power-1 We use this assumption...

Last reply: Marcus Sheffer, Jun 22, 2023, 10:56 am

Minimum Outside air in DCV systems

NC-v4.1 EQp1: Minimum indoor air quality performance
posted by Marc Maso on Jun 22, 2023, 9:16 am

Dear Srs, we are using the DCV strategy in one building. The doubt are when we need to ventilated or not...

A room have a schedule of 8am to 18:00

  • Beetween this hours the room...

Regional Priority credit for an L&T credit

CI-v4 LTc1: LEED for Neighborhood Development location
posted by Cindy Quinn on Jun 20, 2023, 5:54 pm

Our project is located in an ND Gold certified neighborhood.  If we pursue the LEED for ND location credit in leiu of other L&T credits, how can we receive a Regional Priority point for...

Last reply: Dave Hubka, Jun 21, 2023, 9:35 pm

Can you turn on RTUs to help dry materials and test equipment prior to building construction completion?

NC-v4 EQc3: Construction indoor air quality management plan
posted by Karen Shilo on Jan 4, 2023, 9:03 am

In the case of drying materials and to help run some tests for the commissioning processes to make sure building equipment is functioning properly, can you turn on RTUs prior to building...

Last reply: Alice Wilson, Jun 20, 2023, 3:51 am

Multi-family Stormwater alternative documentation

NC-v4.1 SSc4: Rainwater management
posted by Summer Gorder on Jun 19, 2023, 1:34 pm

Our project is in Seattle with stringent Stormwater requirements. The Civil Engineer used software that they’re required to use to size BMPs, but it does not provide the info in the calculator...

Last reply: Dave Hubka, Jun 19, 2023, 2:11 pm