LEED Online Open Space FormNC-v4 SSc3: Open spaceposted by Azra on Jun 28, 2023, 6:16 am
Dear all, I noticed something peculiar in my last project. Last reply: Azra, Jun 29, 2023, 6:46 am |
|
Green Building Education- Educational Outreach Program vs. Guided TourNC-v4 INc1: Innovationposted by Katy Keene on Feb 17, 2020, 8:12 am
For our project, we are planning on selecting the below two options:
Last reply: emily reese moody, Jun 28, 2023, 9:23 pm |
|
Is pc98 required to earn pc99?Pilot-Credits IPpc99: Design for Enhanced Resilienceposted by Elizabeth Powers on Feb 12, 2020, 7:01 pm
Can someone clarify if a project needs to have performed the hazard assessment in pilot credit 98 and during pre-design, in order to be eligible for this pilot credit, or does this pilot credit... Last reply: Allison Smith, Jun 28, 2023, 7:01 pm |
|
Ride Share vs Car Share // Alternative Compliance and/or EquivalencyND-v4 NPDc8: Transportation demand managementposted by Matthew VanSweden on Jun 28, 2023, 4:40 pm
In 2023, the availability of ride-share platforms (i.e., Uber and Lyft) has made some early market car-sharing platforms obsolete (i.e., ZipCar and others). Yet, I see in the LEED-ND v4 credit... Last reply: Eliot Allen, Jun 28, 2023, 6:05 pm |
|
Exterior doors/windows in v4.1NC-v4.1 EQc2: Low-emitting materialsposted by Emily Purcell on Jan 5, 2021, 2:36 pm
Hi all, I'm looking at this past thread on the v4 Low-Emitting credit and how to account for exterior doors: ... Last reply: Jennifer Kruse, Jun 28, 2023, 10:00 am |
|
Construction IAQ Management Plan during demolition phase?NC-v4 EQc3: Construction indoor air quality management planposted by Elizabeth Kertesz on Sep 1, 2018, 11:06 am
For a major renovation project, should we implement the... Last reply: Afogreen Build, Jun 27, 2023, 12:12 pm |
|
how can attachments (drawings, images) be sent in a CIR?NC-v4 IPc1: Integrative processposted by Sara BENLOUBA on May 25, 2023, 4:45 am
Dear Everybody, We would like to send a... Last reply: Afogreen Build, Jun 27, 2023, 12:08 pm |
|
TOD No Minimum for ParkingNC-v4 LTc7: Reduced parking footprintposted by Graham Linn on Jun 23, 2023, 8:00 pmto reduce its parking below that minimum. It does sound a bit stretch-y but it's very much in line with the intent of the credit. There are a lot of posts in this forum asking what to do if the ITE... Last reply: Graham Linn, Jun 26, 2023, 12:18 pm |
|
Renewable energyEBOM-v4.1 EAp3: Energy Performanceposted by SAMY Chamy on Jun 23, 2023, 9:16 am
Hi Team, We have received an inquiry from a large corporation with more than 20 buildings on the same campus that has 2.5 MW of solar on its roof and operates with net metering (... |
|
Creating Baseline building Shell based on ΑSHRAE 90.1-2010- proposed building walls with more than 40% of glassNC-v4 EAc2: Optimize Energy Performanceposted by Konstantina Kalliakoudi on Jun 16, 2023, 3:52 am
Hello to all LEED Users, My proposed building has following percentage of glass at each orientation: NE: 90% percentage of glass SE: 90% percentage of glass NW: 90%... Last reply: Konstantina Kalliakoudi, Jun 23, 2023, 4:20 am |