"with a specialty appropriate for the project."ND-v4 INc2: LEED Accredited Professionalposted by Matthew VanSweden on Jun 29, 2023, 6:18 pm
Considering how few LEED AP ND professionals there are, and how few LEED-ND certified projects, would a LEED AP BD+C qualify for a specialty "appropriate for the [ND] project?" Asking for a... Last reply: Matthew VanSweden, Jun 30, 2023, 1:16 pm |
|
No showerNC-v4 WEp2: Indoor water use reductionposted by Ricardo Sá on Oct 3, 2018, 5:07 am
Hi, when a building does not include shower facilities (neither its occupants are expected to use any adjacent facility), how shall showers usage be treated in proposed building?... Last reply: Dave Hubka, Jun 30, 2023, 10:11 am |
|
Does a covered non-enclosed ground level vehicle circulation to the lobby contribute to the total site paving area?NC-v4 SSc5: Heat Island Reductionposted by Nicholas Chan on Jun 27, 2023, 10:24 pm
Hi! We have a residential project where there is ground level vehicle circulation (not-enclosed) that is hardscape. In addition, it is entirely covered, but not enclosed, by the... Last reply: emily reese moody, Jun 30, 2023, 1:44 am |
|
New certified building on an existing campusNC-v4.1 LTc7: Reduced parking footprintposted by Emma Onofri on Jun 20, 2022, 11:17 am
Hello everybody, I am working on a building with offices and process parts located on an existing campus with the same tenant and with all the building connected to the same main entrance... Last reply: emily reese moody, Jun 30, 2023, 1:31 am |
|
Weighted Area vs AreaNC-v4 SSc5: Heat Island Reductionposted by Osman Faroq on Jun 25, 2023, 9:23 am
Dear LEED users, I need clarification about the LEED heat island calculator. Please explain to me the difference between the weighted area and the area in the non-roof measures calculator... Last reply: emily reese moody, Jun 30, 2023, 1:13 am |
|
Project changesNC-v4.1 SSc5: Heat Island Reductionposted by Jordi Castellano on Jan 18, 2023, 2:53 am
I have a question regarding the changes that can occur between the design phase and the construction phase: If during the design phase a green roof was considered (where the credits have... Last reply: emily reese moody, Jun 30, 2023, 1:04 am |
|
LEED Online Open Space FormNC-v4 SSc3: Open spaceposted by Azra on Jun 28, 2023, 6:16 am
Dear all, I noticed something peculiar in my last project. Last reply: Azra, Jun 29, 2023, 6:46 am |
|
Green Building Education- Educational Outreach Program vs. Guided TourNC-v4 INc1: Innovationposted by Katy Keene on Feb 17, 2020, 8:12 am
For our project, we are planning on selecting the below two options:
Last reply: emily reese moody, Jun 28, 2023, 9:23 pm |
|
Is pc98 required to earn pc99?Pilot-Credits IPpc99: Design for Enhanced Resilienceposted by Elizabeth Powers on Feb 12, 2020, 7:01 pm
Can someone clarify if a project needs to have performed the hazard assessment in pilot credit 98 and during pre-design, in order to be eligible for this pilot credit, or does this pilot credit... Last reply: Allison Smith, Jun 28, 2023, 7:01 pm |
|
Ride Share vs Car Share // Alternative Compliance and/or EquivalencyND-v4 NPDc8: Transportation demand managementposted by Matthew VanSweden on Jun 28, 2023, 4:40 pm
In 2023, the availability of ride-share platforms (i.e., Uber and Lyft) has made some early market car-sharing platforms obsolete (i.e., ZipCar and others). Yet, I see in the LEED-ND v4 credit... Last reply: Eliot Allen, Jun 28, 2023, 6:05 pm |