Log in
Forum
Topic

LEED Online Open Space Form

NC-v4 SSc3: Open space
posted by Azra on Jun 28, 2023, 6:16 am

Dear all,

I noticed something peculiar in my last project.
When I entered the values of open space area and vegetated open spaces area, it gave me as result higher value than...

Last reply: Azra, Jun 29, 2023, 6:46 am

Green Building Education- Educational Outreach Program vs. Guided Tour

NC-v4 INc1: Innovation
posted by Katy Keene on Feb 17, 2020, 8:12 am

For our project, we are planning on selecting the below two options:

  1. A comprehensive signage program built into the building's spaces to educate the occupants and visitors of the...

Last reply: emily reese moody, Jun 28, 2023, 9:23 pm

Is pc98 required to earn pc99?

Pilot-Credits IPpc99: Design for Enhanced Resilience
posted by Elizabeth Powers on Feb 12, 2020, 7:01 pm

Can someone clarify if a project needs to have performed the hazard assessment in pilot credit 98 and during pre-design, in order to be eligible for this pilot credit, or does this pilot credit...

Last reply: Allison Smith, Jun 28, 2023, 7:01 pm

Ride Share vs Car Share // Alternative Compliance and/or Equivalency

ND-v4 NPDc8: Transportation demand management
posted by Matthew VanSweden on Jun 28, 2023, 4:40 pm

In 2023, the availability of ride-share platforms (i.e., Uber and Lyft) has made some early market car-sharing platforms obsolete (i.e., ZipCar and others). Yet, I see in the LEED-ND v4 credit...

Last reply: Eliot Allen, Jun 28, 2023, 6:05 pm

Exterior doors/windows in v4.1

NC-v4.1 EQc2: Low-emitting materials
posted by Emily Purcell on Jan 5, 2021, 2:36 pm

Hi all,

I'm looking at this past thread on the v4 Low-Emitting credit and how to account for exterior doors: ...

Last reply: Jennifer Kruse, Jun 28, 2023, 10:00 am

Construction IAQ Management Plan during demolition phase?

NC-v4 EQc3: Construction indoor air quality management plan
posted by Elizabeth Kertesz on Sep 1, 2018, 11:06 am

For a major renovation project, should we implement the...

Last reply: Afogreen Build, Jun 27, 2023, 12:12 pm

how can attachments (drawings, images) be sent in a CIR?

NC-v4 IPc1: Integrative process
posted by Sara BENLOUBA on May 25, 2023, 4:45 am

Dear Everybody,

We would like to send a...

Last reply: Afogreen Build, Jun 27, 2023, 12:08 pm

TOD No Minimum for Parking

NC-v4 LTc7: Reduced parking footprint
posted by Graham Linn on Jun 23, 2023, 8:00 pm

with the intent of the credit. There are a lot of posts in this forum asking what to do if the ITE reductions come in lower than the local zoning minimum, and "look for TOD incentives" is always part...

Last reply: Graham Linn, Jun 26, 2023, 12:18 pm

Renewable energy

EBOM-v4.1 EAp3: Energy Performance
posted by SAMY Chamy on Jun 23, 2023, 9:16 am

Hi Team,

We have received an inquiry from a large corporation with more than 20 buildings on the same campus that has 2.5 MW of solar on its roof and operates with net metering (...

Creating Baseline building Shell based on ΑSHRAE 90.1-2010- proposed building walls with more than 40% of glass

NC-v4 EAc2: Optimize Energy Performance
posted by Konstantina Kalliakoudi on Jun 16, 2023, 3:52 am

Hello to all LEED Users,

My proposed building has following percentage of glass at each orientation:

NE: 90% percentage of glass

SE: 90% percentage of glass

NW:  90%...

Last reply: Konstantina Kalliakoudi, Jun 23, 2023, 4:20 am