Log in
Forum
Topic

OPR & BOD & Design Document review

NC-v4 EAp1: Fundamental commissioning and verification
posted by Dave Hubka on Sep 30, 2021, 3:28 pm

Fundamental Commissioning requires the...

Last reply: Edgar Arevalo, Aug 9, 2023, 7:03 pm

Schedule for Data Center Load

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Aug 7, 2023, 3:14 pm

Hi I am modeling a Data Center what schedule should I use for IT loads, should I run it for 100% all the time?

Last reply: Marcus Sheffer, Aug 9, 2023, 4:37 pm

Renewable Energy Production

NC-v4 EAp2: Minimum Energy Performance
posted by Piotr Adamczyk on Aug 9, 2023, 2:32 am

Dear All,

I want to ask you how you approach taking into account the yield of the photovoltaic installation in the MEPC calculator.
I received the yield calculation from the designer...

Last reply: Marcus Sheffer, Aug 9, 2023, 4:27 pm

Path 3: Proposed building values exceeding 5% in one category.

CI-v4.1 MRc2: Interiors life-cycle impact reduction
posted by Gaston Michaud on Jul 18, 2023, 1:13 pm

Hi everyone, 

We have a project that has several design optimizations and is reusing most of the furniture and some walls. The LCA shows the proposed construction with a 20% reduction in...

Last reply: Sarah Buffaloe, Aug 8, 2023, 1:55 pm

Baseline Model for Data center Economizer

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Aug 8, 2023, 12:36 pm

Hi, 

I have encountered an issue with the baseline model for Data Center , based on LEED Comments we are using system 8 and for climate zone 5a the economizer shut off limit is 70F, the...

Last reply: Moses Chong, Aug 8, 2023, 12:55 pm

All Gender Restrooms- Extent of Hygiene Product Distribution

NC-v4 INc1: Innovation
posted by Summer Minchew on Apr 2, 2021, 10:56 am

The All Gender Restrooms Pilot general requirements state: "Facilities should provide means for the distribution of menstruation hygiene products." This is a little vauge, does this mean every...

Last reply: Graham Linn, Aug 7, 2023, 8:18 pm

Parking Calculations per GSF or NSF

CS-v4.1 LTc7: Reduced parking footprint
posted by Angi Rivera on Aug 7, 2023, 12:11 pm

Hello! Does anyone know whether we need to use GSF or NSF when calculating LEED base ratio requirements?

Thanks!

Angi

Last reply: Dave Hubka, Aug 7, 2023, 1:32 pm

All campus occupants will use showerheads inside our building

NC-v4 WEp2: Indoor water use reduction
posted by Paola Moschini on Aug 7, 2023, 8:30 am

Our building is on a campus (industrial facility where all workers need to make a shower at the end of the worktime) and our building provides restroom facilities with showerheads for all other...

Last reply: Emily Purcell, Aug 7, 2023, 12:14 pm

AHSRAE 90.1, G3 Modeling Question- External Louvers/Shades

NC-v4 EAp2: Minimum Energy Performance
posted by Brian Salazar on Aug 7, 2023, 11:47 am

Hello!  Our team is researching opportunities to reduce SHG loads on an 8-story new construction university residence hall.  The question has come up regarding the use of external-fixed louvers...

Last reply: Marcus Sheffer, Aug 7, 2023, 11:59 am

Wire transfer information for USGBC membership renewal payment

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Thomas Tan on Aug 7, 2023, 4:06 am

Dear All,

Our company USGBC membership has been expired and I want to renew our USGBC membership via international bank transfer. I chekced USGBC website and did not find the wire transfer...