Flush-out option preferred, but some furniture delivery delayed

NC-v4 EQc4: Indoor air quality assessment
posted by Erica Downs on Aug 15, 2019, 11:58 am

The project contractor intends to do a full flush-out prior to occupancy.  Most of the furniture will be installed prior to flush-out, but on particular oder has been delayed and may not arrive...

Last reply: emily reese moody, Jun 24, 2024, 3:19 pm

First public comment draft of LEED v5 BD+C/ID+C: Energy and Atmosphere

LEED v5 BD+C/ID+C: Energy and Atmosphere Public Comments
posted by Nadav Malin on Apr 2, 2024, 1:52 pm

Share your comments on the first public comment draft of LEED v5 BD+C/ID+C: Energy and Atmosphere category on this forum. You can either reply to this thread or use the "Post a Question/Comment"...

Last reply: Mark Terpstra, Jun 24, 2024, 11:59 am

Hotels-Campus guidance or LEED Interpretation 10203

LEED Guidance for Campuses and Multiple Buildings
posted by Ana Milinkovic on Nov 23, 2021, 5:11 am

Hello,

I have a question regarding the approach for our project that wants to be LEEd certified. The project site consists of 9 buildings with similar use. In particula, the principal...

Last reply: Kath Williams, Jun 24, 2024, 10:48 am

Energy Star Rated Equivalent

LEED v4.1 Discussion Forum
posted by Roshan Pradhan on Jun 24, 2024, 5:34 am

Does TM-21 tested LED luminaire, with efficiency greater than 94% at 6000 hours meets the alternate equivalent criteria for Energy star rated products?

Telecommute Option in Arc Transportation Survey

EBOM-v4.1 LTp1: Transportation Performance
posted by on Sep 19, 2023, 4:03 pm

Hello all,

I am trying to figure out what is meant by and how to enter "route" data for telecommuters in the Arc transportation survey. It asks for miles(or km) traveled to the building....

Last reply: RICCARDO BALLESIO, Jun 24, 2024, 8:50 am

Composite Wood- CARB Phase II

NC-v4 EQc2: Low-emitting materials
posted by Brad Newkirk on Jul 24, 2018, 7:49 pm

Does plywood that meets...

Last reply: Catarina Costa Goncalves, Jun 24, 2024, 7:56 am

Appendix 2 default values

Calculating FTEs
posted by Julio Fernandez Amodia on May 11, 2023, 8:53 am

Dear all,

I am currently estimating the occupancy of a mall building. I have determined the occupancy following Appendix 2 default occupancies from LEED.

However, I am confused...

Last reply: Andrey Kuznetsov, Jun 23, 2024, 5:45 am

Purple Roof

NC-v4 SSc5: Heat Island Reduction
posted by Edgar Arevalo on Jun 20, 2024, 12:29 pm

Has anyone encountered a project where the client or other circumstances suggested we look into purple roof solution.  From the looks of it, it's a green roof solution with optimized stormwater...

Last reply: emily reese moody, Jun 23, 2024, 7:50 pm

Entryway system

CI-v4 EQc1: Enhanced indoor air quality strategies
posted by RAMON CHRISTOPHER MEDRANO on Nov 17, 2021, 10:11 pm

I have a office space project, that will have an entryway system (walk off matt). My question is where is the accaptable way to install the walk of matt it should be 10-feet (3meters) inside the...

Last reply: Andrey Kuznetsov, Jun 23, 2024, 6:02 am

District cold storage project

NC-v4 EAp2: Minimum Energy Performance
posted by Ryan Wang on Jun 21, 2024, 2:49 am

Hi all experts,

I'm working on 4 cold storage warehouses which all the cooling source form one refrigerating planttoom, i guess i should consider it as the "district cold storage" ,...

Last reply: Andrey Kuznetsov, Jun 23, 2024, 5:53 am