Topic | Recent |
---|---|
Pilot Closed- attending LEED v4.1 Optimize Process Water UsePilot-Credits WEpc94: No Cooling Towerposted by Adriana Hansen on Apr 16, 2024, 1:39 pm
This pilot credit allows to many office buildings that have a VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1... |
|
EAc Reduce peak thermal loadsLEED v5 BD+C/ID+C: Energy and Atmosphere Public Commentsposted by Emily Purcell on Apr 16, 2024, 12:26 pm
Very happy to see a heavily weighted credit breaking out thermal loads from the whole building energy model credit. This will be a great incentive not to ignore envelope even in buildings where... |
|
Number of eligible Innovation credits from Pilot CreditsNC-v4 INc1: Innovationposted by Jason Garvens on Jan 15, 2018, 12:00 pm
Can anyone confirm the number of points that can be earned solely through achieving Pilot credits? The way I read the requirements in the Innovation section it would appear to be up to... Last reply: Afogreen Build, Apr 15, 2024, 8:59 pm |
|
EAc2 Optimize Energy Performance: Baseline Building Heating SourceNC-v4 EAc2: Optimize Energy Performanceposted by Ricardo Sá on Apr 27, 2023, 5:43 am
Hello. I have a question regarding LEED v4 NC, EAc2 Optimize Energy Performance: We’re currently involved in a project that is considering the use of biomass as heating source (... Last reply: Afogreen Build, Apr 15, 2024, 8:55 pm |
|
Wind PPA OR PV garden questionNC-v4 EAc5: Renewable energy productionposted by Kyu-min Lee on Apr 15, 2024, 1:29 pm
Hello,LEEDuser!!!! My project is planning to contract at least 10year more than 10 Gwh.(not confirmed about wind or PV but the amount is fixed, located in same utility service area) ...Last reply: Kyu-min Lee, Apr 15, 2024, 4:28 pm |
|
CONSTRUCTION WASTE HEATED FOR CLINKER PRODUCTION, COUNTED AS WASTE DIVERSION?NC-v4 MRp2: Construction and demolition waste management planningposted by Olga Yuil on Apr 15, 2024, 3:55 pm
For a project located in Central America, construction waste is used for clinker production. For this purpose, construction waste is heated to temperatures above 900C. According to those... |
|
Will burning construction waste to make recycled content in cement count as recycle?NC-v4 MRp2: Construction and demolition waste management planningposted by Michael on Jun 8, 2022, 5:59 am
Hi LEED experts, if construction waste streams are collected and processed in a cement processing plant, then can we count these waste streams are recycled? The construction waste will become... Last reply: Olga Yuil, Apr 15, 2024, 3:52 pm |
|
can I get point with double contraction??NC-v4 EAc4: Demand responseposted by Kyu-min Lee on Mar 30, 2024, 11:54 pm
Hi, While planning to obtain platinum level certification, there are difficulties in proving contractual matters such as... Last reply: Kyu-min Lee, Apr 15, 2024, 1:40 pm |
|
Bike storage distanceNC-v4 LTc6: Bicycle facilitiesposted by Pia Öhrling on Jan 21, 2016, 10:16 am
How do you calculate the distance if the bike storage is inside the building basement and you can bike to it after you have entered the door? Last reply: Michelle Halle Stern, Apr 15, 2024, 12:33 pm |
|
What are the key objectives of the Plastic Recycling Show in India 2024?NC-2009 MRc4: Recycled Contentposted by Stive John on Apr 15, 2024, 6:21 am
The Plastic Recycling Show in India 2024 aims to promote awareness and adoption of innovative recycling... |