Log in
Forum
Topic

Average Retail Customers for a Bank & Uploading Cut sheets

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Geoffrey Tomlinson on Mar 1, 2011, 7:35 pm

The project that I am currently working on is a bank that has bathrooms in the lobby for client use and employee bathrooms in the office space behind the lobby. I am trying to figure out the...

Last reply: Dan Ackerstein, Apr 25, 2011, 9:25 am

Option 3, approach 2: Random selection

EBOM-2009 SSc4: Alternative Commuting Transportation
posted by gwenedd murray on Apr 7, 2011, 2:25 pm

This building is over 300,000 sf and located close to public transportation. Half of the tenants are government agencies. The building manager stated if we send out electronic surveys we will...

Last reply: Dan Ackerstein, Apr 25, 2011, 9:20 am

Views for an Apartment Building

NC-2009 IEQc8.2: Daylight and views - views
posted by Lauren Fakhoury on Apr 25, 2011, 8:12 am

I'm working on documenting this credit for an apartment building but have a question about documenting it. Most of the floors are identical in terms of rooms square footage and layout. Do I have...

Last reply: Carlie Bullock-Jones, Apr 25, 2011, 8:25 am

Line of sight to spaces with glass roofs

NC-2009 IEQc8.2: Daylight and views - views
posted by Lauri Tähtinen on Dec 3, 2010, 4:46 am

To be sertain, I want to ask a opinion for a situation, where a office building has vision to inner yard. Basic situation contains two office masses with glass roof covered 35 ft inner yard in...

Last reply: Jill Perry, PE, Apr 24, 2011, 6:25 pm

ASHREA Simulation vs. actual building operations

CS-2009 EAc5.1: Measurement and verification - base building
posted by Susann Geithner on Dec 15, 2010, 6:10 pm

When we enter the calculated consumptions from EA P2 into the EA C5.1 LEED Online form, can I than use other values, which are based on actual building operation and performance?
We deal...

Last reply: Gordon Shymko, Apr 24, 2011, 4:09 pm

Air Pollution

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Lu Anne Nielsen on Apr 12, 2011, 3:09 pm

SSp1 was marked under pending for my current project. The review tells me to provide a revised LEED Prerequisite Form that includes a detailed narrative describing the measures taken for the...

Last reply: Lisa Fabula, Apr 23, 2011, 11:30 pm

LEED CS 2009- "Cold, Dry, Dark, Shell?"

LEED Rating System Selection
posted by Tony Ricketts on Apr 6, 2011, 3:34 pm

We have been asked to provide designs for a...

Last reply: Tristan Roberts, Apr 23, 2011, 10:29 pm

To LEED CI or not lead to CI? That is the question...

LEED Rating System Selection
posted by anastasia harrison on Apr 20, 2011, 8:36 pm

We have a client who is a state school run by a not-for profit organization. Technically the owner is the state; operator the school, but this can be blurry and perceived as owner/operator....

Last reply: Tristan Roberts, Apr 23, 2011, 10:13 pm

Natural Ventilation- Single Space

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Omer Moltay on Mar 11, 2011, 11:06 am

Almost all the spaces in our building is mechanically ventilated, except the entrance lobby which receives outside air through revolving doors. The revolving door opening area and the 8 m. rule...

Last reply: Tristan Roberts, Apr 23, 2011, 8:58 pm

Reuse of building structure

NC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roof
posted by Adriana Hansen on Apr 11, 2011, 2:00 pm

Hello,

We are working with a major renovation in a stadium. The huge structural external columms will be maintained (100%), but the floor slabs will be demolished, except for some parts of...

Last reply: Tristan Roberts, Apr 23, 2011, 8:57 pm