Topic | Recent |
---|---|
LEED Daylight Simulation Option1 with IES-VENC-v4 EQc7: Daylightposted by Mahshid Sedighimoghaddam on Jan 10, 2024, 4:57 am
Hello everyone, We are doing Daylight simulation with IES-VE software in compliance with LEED daylighting Option 1. We know that it is required two sets of simulations with and... |
|
Desiccant Wheel Modeling for Baseline caseNC-v4.1 EAp2: Minimum Energy Performanceposted by John on Jan 2, 2024, 8:19 am
I am working on a model which has Desiccant wheel in design case. Do we need to model desiccant wheel in baseline case as well? I dont see any section related to this in ASHRAE 90.1, however, in... Last reply: John, Jan 10, 2024, 6:12 am |
|
Thermal Comfort ControlNC-v4 EQc5: Thermal comfortposted by Martin Maribo on Nov 3, 2023, 4:56 am
How can individual thermal comfort controls be achieved for individual workstations in an open office? Last reply: Afogreen Build, Jan 9, 2024, 8:02 pm |
|
Electricity with Demand FlexibilityPilot-Credits EApc152: GridOptimal Building ACPposted by Cory Duggin on Jan 13, 2023, 4:27 pm
What is the best way to determein any electricity with demand flexibility? What should I input in the form if it is 0? If I enter 0 it acts like all fields haven't been filled out, so I used 0.... Last reply: , Jan 9, 2024, 4:36 pm |
|
Non Attainment Area (Project Location)CS-v4 EQp1: Minimum indoor air quality performanceposted by Nagaraj Sankar on Oct 17, 2023, 6:05 am
1. It appears that we are encountering a persistent issue in our projects. Many of our projects are situated in Non-Attainment areas, and we are already using... Last reply: Afogreen Build, Jan 8, 2024, 9:05 pm |
|
CDWM- Recycling Facility Diversion RateNC-v4 MRp2: Construction and demolition waste management planningposted by Preethi Sreeraj on Jan 6, 2024, 11:50 am
It is clear from the guidance that a project will need the diversion rate of the... |
|
How to claim "NC-v4 EAc3- Advanced energy metering" credit for VillasNC-v4 EAc3: Advanced Energy Meteringposted by QUANG DOAN on Jan 4, 2024, 4:15 am
Before diving deep into the question, to gain more insight into the project, please read the following overview:
Last reply: Marcus Sheffer, Jan 5, 2024, 10:44 am |
|
Location of outside airflow measuring station inside the HVAC unitNC-v4 EQp1: Minimum indoor air quality performanceposted by Edgar Arevalo on Jan 4, 2024, 1:15 pm
We have a 100% outside air HVAC with an energy recovery wheel serving the entire the project space. Since there is no recirculating air getting reintroduced to the supply side, the MEP engineer... Last reply: Edgar Arevalo, Jan 5, 2024, 10:05 am |
|
LEED Registration for 2 buildings on same plotLEED Guidance for Campuses and Multiple Buildingsposted by Pulak Goyal on Jan 4, 2024, 4:33 am
I have two buildings going for LEED v4.1 O+M Existing Buildings certification. They are connected with a bridge on 1 level. Can I register them as 1 building for certification? Or will... Last reply: Dave Hubka, Jan 5, 2024, 9:25 am |
|
Related to fresh air CalaulationNC-v4 EQp1: Minimum indoor air quality performanceposted by Nagaraj Sankar on Nov 13, 2023, 11:57 am
Hi users, 1)One of our Production building project having fresh air supply with fresh air louver opposite to the exhaust fans how can account this in fresh air calculator. 2)And how... Last reply: Gustavo De las Heras Izquierdo, Jan 4, 2024, 9:31 pm |