Log in
Forum
Topic

Certification Process- Is there a time limit for preparing documetation after the preliminary Design Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Konstantina Kalliakoudi on Mar 28, 2023, 9:45 am

Hello,

I have following question about the  Certification process.

For the project I am working on, we will choose split review.

So, that means, that in the beginning we are...

Last reply: Susan Di Giulio, Mar 28, 2023, 1:12 pm

Steel Finishing Products and VOCs

CI-v4 EQc2: Low-emitting materials
posted by Akos Brandecker on Mar 28, 2023, 12:22 pm

We are working on a number of projects where a large amount of internal metal staircases and other architectural steel elements need finishing and painting on site. These are generally 2 pack...

Last reply: Michelle Rosenberger, Mar 28, 2023, 12:58 pm

USGBC calculator

LEED v4.1 Discussion Forum
posted by Emerson Alas on Oct 15, 2020, 11:28 am

The "Arc_Data_Template" is the same "USGBC Calculator" referred to in the reference guide?

Last reply: Chuck Lohre, Mar 27, 2023, 4:10 pm

No Mow Grass

Schools-NC-v4 SSc2: Site development - protect or restore habitat
posted by Cynthia Kaplan on May 12, 2016, 1:39 pm

Can my school project utilize No Mow grass as part of our site restoration, or would this still be considered a monoculture?

Last reply: Danielle Waters, Mar 27, 2023, 3:36 pm

Modeling baseline building envelope for CI project, Purchased energy (condenser water)

CI-v4 EAp2: Minimum Energy Performance
posted by Yousef Abougabal on Mar 27, 2023, 1:50 pm

Project Type: LEED ID+C (CI) Version 4

Energy & Atmosphere, EAp2: Minimum Energy Performance & EA Credit: Optimize Energy Performance

Option 1 - Tenant Level Energy...

Solar powered parking lot lights

NC-v4 EAc5: Renewable energy production
posted by Jason Garvens on Jan 10, 2018, 5:01 pm

Would dedicated solar powered parking lot lights help contribute toward obtaining x% of the buildings annual energy cost covered by...

Last reply: Marcus Sheffer, Mar 27, 2023, 1:52 pm

Parking Garage & exterior Site Lighting part of building Energy Model?

NC-2009 EAp2: Minimum Energy Performance
posted by Adrian Arenas on May 2, 2018, 11:39 am

We Have two building pursuing LEED v2009 NC, both building share an underground parking garage. 

1) Should we include the artificial Lighting in the Parking Garage (serving LEED...

Last reply: Marcus Sheffer, Mar 27, 2023, 12:50 pm

INDIA ACP Interior lighting

NC-v4 EQc6: Interior lighting
posted by Lalitya Reddy on Mar 27, 2023, 2:58 am

Hello LEEDusers,

I am looking for guidance on Interior Lighting credit in LEED v4 and v4.1

The USGBC credit library mentions that there is an India ACP for Interior Lighting. This...

Direction for testing new and retrofitted equipment

CI-v4 EAc1: Enhanced Commissioning
posted by Francesco Passerini on Mar 27, 2023, 4:38 am

Dear all,

Among the content that is request for the Ongoing...

Modeling Proposed and Baseline System

CI-v4 EAc2: Optimize Energy Performance
posted by Rajat Wadhwa on Mar 21, 2023, 4:00 pm

Hi Everyone, I am working on a 10,000 sqft tenant fit out LEED project, the building is close to 250,000 sqft building with 5 stories. Now the building has a DOAS system and we are going to have...

Last reply: Marcus Sheffer, Mar 26, 2023, 4:51 pm