Certification Process- Is there a time limit for preparing documetation after the preliminary Design ReviewLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Konstantina Kalliakoudi on Mar 28, 2023, 9:45 am
Hello, I have following question about the Certification process. For the project I am working on, we will choose split review. So, that means, that in the beginning we are... Last reply: Susan Di Giulio, Mar 28, 2023, 1:12 pm |
|
Steel Finishing Products and VOCsCI-v4 EQc2: Low-emitting materialsposted by Akos Brandecker on Mar 28, 2023, 12:22 pm
We are working on a number of projects where a large amount of internal metal staircases and other architectural steel elements need finishing and painting on site. These are generally 2 pack... Last reply: Michelle Rosenberger, Mar 28, 2023, 12:58 pm |
|
USGBC calculatorLEED v4.1 Discussion Forumposted by Emerson Alas on Oct 15, 2020, 11:28 am
The "Arc_Data_Template" is the same "USGBC Calculator" referred to in the reference guide? Last reply: Chuck Lohre, Mar 27, 2023, 4:10 pm |
|
No Mow GrassSchools-NC-v4 SSc2: Site development - protect or restore habitatposted by Cynthia Kaplan on May 12, 2016, 1:39 pm
Can my school project utilize No Mow grass as part of our site restoration, or would this still be considered a monoculture? Last reply: Danielle Waters, Mar 27, 2023, 3:36 pm |
|
Modeling baseline building envelope for CI project, Purchased energy (condenser water)CI-v4 EAp2: Minimum Energy Performanceposted by Yousef Abougabal on Mar 27, 2023, 1:50 pm
Project Type: LEED ID+C (CI) Version 4 Energy & Atmosphere, EAp2: Minimum Energy Performance & EA Credit: Optimize Energy Performance Option 1 - Tenant Level Energy... |
|
Solar powered parking lot lightsNC-v4 EAc5: Renewable energy productionposted by Jason Garvens on Jan 10, 2018, 5:01 pm
Would dedicated solar powered parking lot lights help contribute toward obtaining x% of the buildings annual energy cost covered by... Last reply: Marcus Sheffer, Mar 27, 2023, 1:52 pm |
|
Parking Garage & exterior Site Lighting part of building Energy Model?NC-2009 EAp2: Minimum Energy Performanceposted by Adrian Arenas on May 2, 2018, 11:39 am
We Have two building pursuing LEED v2009 NC, both building share an underground parking garage. 1) Should we include the artificial Lighting in the Parking Garage (serving LEED... Last reply: Marcus Sheffer, Mar 27, 2023, 12:50 pm |
|
INDIA ACP Interior lightingNC-v4 EQc6: Interior lightingposted by Lalitya Reddy on Mar 27, 2023, 2:58 am
Hello LEEDusers, I am looking for guidance on Interior Lighting credit in LEED v4 and v4.1 The USGBC credit library mentions that there is an India ACP for Interior Lighting. This... |
|
Direction for testing new and retrofitted equipmentCI-v4 EAc1: Enhanced Commissioningposted by Francesco Passerini on Mar 27, 2023, 4:38 am
Dear all, Among the content that is request for the Ongoing... |
|
Modeling Proposed and Baseline SystemCI-v4 EAc2: Optimize Energy Performanceposted by Rajat Wadhwa on Mar 21, 2023, 4:00 pm
Hi Everyone, I am working on a 10,000 sqft tenant fit out LEED project, the building is close to 250,000 sqft building with 5 stories. Now the building has a DOAS system and we are going to have... Last reply: Marcus Sheffer, Mar 26, 2023, 4:51 pm |