how can attachments (drawings, images) be sent in a CIR?NC-v4 IPc1: Integrative processposted by Sara BENLOUBA on May 25, 2023, 4:45 am
Dear Everybody, We would like to send a... Last reply: Afogreen Build, Jun 27, 2023, 12:08 pm |
|
TOD No Minimum for ParkingNC-v4 LTc7: Reduced parking footprintposted by Graham Linn on Jun 23, 2023, 8:00 pmto reduce its parking below that minimum. It does sound a bit stretch-y but it's very much in line with the intent of the credit. There are a lot of posts in this forum asking what to do if the ITE... Last reply: Graham Linn, Jun 26, 2023, 12:18 pm |
|
Renewable energyEBOM-v4.1 EAp3: Energy Performanceposted by SAMY Chamy on Jun 23, 2023, 9:16 am
Hi Team, We have received an inquiry from a large corporation with more than 20 buildings on the same campus that has 2.5 MW of solar on its roof and operates with net metering (... |
|
Creating Baseline building Shell based on ΑSHRAE 90.1-2010- proposed building walls with more than 40% of glassNC-v4 EAc2: Optimize Energy Performanceposted by Konstantina Kalliakoudi on Jun 16, 2023, 3:52 am
Hello to all LEED Users, My proposed building has following percentage of glass at each orientation: NE: 90% percentage of glass SE: 90% percentage of glass NW: 90%... Last reply: Konstantina Kalliakoudi, Jun 23, 2023, 4:20 am |
|
Insulation in Interior walls for Vault Spaces in Data CenterNC-v4 EAc2: Optimize Energy Performanceposted by Rajat Wadhwa on Jun 22, 2023, 4:47 pm
Hi Everyone, We are modeling A Data center and the internal walls forvault spaces have insulation in them because of high temperature in the data center vault spaces, Now I am... Last reply: Marcus Sheffer, Jun 22, 2023, 4:52 pm |
|
Justification of usign the 9.6.2 Additional Power lighting in the Baseline ModelNC-v4.1 EAp2: Minimum Energy Performanceposted by Marc Maso on Jun 19, 2023, 12:22 pmsome post in this forum where the additional power has been defined as process load. For example: https://leeduser.buildinggreen.com/forum/additional-interior-lighting-power-1 We use this assumption... Last reply: Marcus Sheffer, Jun 22, 2023, 10:56 am |
|
Minimum Outside air in DCV systemsNC-v4.1 EQp1: Minimum indoor air quality performanceposted by Marc Maso on Jun 22, 2023, 9:16 am
Dear Srs, we are using the DCV strategy in one building. The doubt are when we need to ventilated or not... A room have a schedule of 8am to 18:00
|
|
Regional Priority credit for an L&T creditCI-v4 LTc1: LEED for Neighborhood Development locationposted by Cindy Quinn on Jun 20, 2023, 5:54 pm
Our project is located in an ND Gold certified neighborhood. If we pursue the LEED for ND location credit in leiu of other L&T credits, how can we receive a Regional Priority point for... Last reply: Dave Hubka, Jun 21, 2023, 9:35 pm |
|
Can you turn on RTUs to help dry materials and test equipment prior to building construction completion?NC-v4 EQc3: Construction indoor air quality management planposted by Karen Shilo on Jan 4, 2023, 9:03 am
In the case of drying materials and to help run some tests for the commissioning processes to make sure building equipment is functioning properly, can you turn on RTUs prior to building... Last reply: Alice Wilson, Jun 20, 2023, 3:51 am |
|
Multi-family Stormwater alternative documentationNC-v4.1 SSc4: Rainwater managementposted by Summer Gorder on Jun 19, 2023, 1:34 pm
Our project is in Seattle with stringent Stormwater requirements. The Civil Engineer used software that they’re required to use to size BMPs, but it does not provide the info in the calculator... Last reply: Dave Hubka, Jun 19, 2023, 2:11 pm |