Topic | Recent |
---|---|
Pervious concrete to drainageNC-v4 SSc4: Rainwater managementposted by Omar Elrawy on Feb 27, 2023, 4:49 am
Hi, Can we comply by using pervious concrete, knowing that the water will not be collected, will just be discharge to perimeter drain? Last reply: Afogreen Build, Jul 26, 2023, 9:23 pm |
|
Definition of a Laboratory SpaceNC-v4 EAp2: Minimum Energy Performanceposted by Michael Hill on Jul 26, 2023, 6:24 pm
I am working on a project which is a facililty that tests tools used in semi-conductor fabrication facilities. The spaces are clean rooms with strict control of temperature, humidity, and... Last reply: Marcus Sheffer, Jul 26, 2023, 7:02 pm |
|
Recycled ContentRetail-NC-v2009 MRc4: Recycled Contentposted by Steve Willey on Jul 26, 2023, 2:35 pm
If Im look for Recycled content, post and pre consumer and all i can find is the total... Last reply: Umesh Atre, Jul 26, 2023, 4:45 pm |
|
Multi attribute optimization (option 2)CS-v4.1 MRc2: Environmental Product Declarationsposted by Michael dickson on Jun 12, 2020, 4:36 pm
i am having a lot of trouble understanding the lauange used to decribe this option if someone can help me understand what i need to acomplish to earn this credit that would ba amazing ... Last reply: Lauren Richardson, Jul 26, 2023, 4:02 pm |
|
Appendix 2. Default occupancy countsNC-v4 LTc6: Bicycle facilitiesposted by Eslam Elshorbagy on Jul 24, 2023, 10:04 am
Hi, I want to ask about the default occupancy table. I'm calculating the building LEED Occupant Load. What would be the correct type for a space in a building that a portion of it is a... Last reply: Eslam Elshorbagy, Jul 26, 2023, 3:04 pm |
|
ASHRAE 55-2010 documentationNC-v4 EQc5: Thermal comfortposted by Katie Vasbinder on Jan 19, 2021, 11:29 am
The Upload for this credit indicates "Documentation may include a psychometric chart, PMV/PPD calculations... Figure 5.2.4.1 and/or Figure 5.2.4.4, or predicted worst case...". Given the amount... Last reply: Aleksandra Suchomska, Jul 26, 2023, 10:48 am |
|
Ventilation WarehousesNC-v4 EQp1: Minimum indoor air quality performanceposted by Helena Garcia on Jun 20, 2016, 4:12 am
We are certifing a project with two buildings, the first is an offices, the second is a warehouses to rent in Spain. Last reply: Emma Loris, Jul 26, 2023, 12:28 am |
|
Indoor Water Use Reduction calculator- Gender RatioNC-v4 WEp2: Indoor water use reductionposted by Caterina Panteghini on Apr 12, 2023, 8:52 am
Hi, did anybody flag "Non default gender mix" in the calculator? Because I have a project with 60% of male and 40% of female but I can not insert these percentages in the calculator... Last reply: Afogreen Build, Jul 25, 2023, 5:37 am |
|
CO2 monitoring for exhaust fan system?NC-v4 EQp1: Minimum indoor air quality performanceposted by Dang Thi on Aug 24, 2020, 4:25 am
Our project are factory, the ventilation system use exhaust fans combined with louvre / open door to tranfer outside air direct from outside. Last reply: Afogreen Build, Jul 25, 2023, 5:36 am |
|
Recycle content for Ready Mix concreteNC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by Osman Faroq on Jun 8, 2023, 7:46 am
Dear LEED users. Hope you are all dowing well. I have question on how we will get the sustainablity values from the recycle content in ready mix concrete. If the suppier provide the... Last reply: Afogreen Build, Jul 25, 2023, 5:34 am |