Interior cross contamination prevention out of scope-CICI-v4 EQc1: Enhanced indoor air quality strategiesposted by Casey Cullen-Woods on Jul 16, 2019, 1:45 pm
I am working on a commercial interior fit out project that would like to pursue this credit. The... Last reply: Catherine Callaway, Oct 15, 2024, 11:59 am |
|
Request for Clarification- Pre-Consumer Recycled Content, LEED v4.0/v4.1NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by HMTX Industries on Oct 12, 2024, 1:15 pm
Greetings! Our company is currently in need of clarification as to whether manufacturing scraps qualify as pre-consumer... Last reply: Kimberly Lombardozzi, Oct 14, 2024, 9:03 am |
|
EDP documentsPilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by David Dixon on Dec 28, 2016, 4:54 pm
working on documentation for the credit I am finding that the documentation in EDPs do not translate to the credit matrix and documenting is not smooth Last reply: Chloe Naese, Oct 13, 2024, 8:55 pm |
|
One Greenguard Certificate for the same product marketed by Multiple Companies?NC-v4.1 EQc2: Low-emitting materialsposted by Tiffany Beffel on Sep 19, 2024, 9:32 pm
Our project used Shaw 4151 LVT Universal Adhesive. Shaw Contract literature makes claim to a Greenguard Certificate that is for the same 4151 universal adhesive, however, the certificate... Last reply: Tiffany Beffel, Oct 12, 2024, 12:47 pm |
|
PV system energy going directly to the gridNC-v4 EAc2: Optimize Energy Performanceposted by Camilo Velez on Oct 7, 2024, 4:40 pm
Good afternoon everyone, We are currently working on a project that is implementing a PV solar array, which will primarily be used for EV charging, but besides that, any excess energy is... Last reply: Camilo Velez, Oct 11, 2024, 11:16 am |
|
Social Equity Within The Supply ChainPilot-Credits IPpc144: Social equity within the supply chainposted by Atlas Turner on Feb 28, 2023, 3:53 pm
The updated Social Equity within the Supply Chain appears to be more achievable. The original required permanently installed products from 10 different manufacturers meeting options 1 or... Last reply: Maria Moreira, Oct 11, 2024, 7:17 am |
|
Heat Island Mitigation with Cool WallsNC-v4 INc1: Innovationposted by Nohemi Mena on Sep 6, 2023, 12:45 pm
Hello everyone! Im working on a project pursuing the SS Pilot Credit: Heat Island Mitigation with Cool Walls, but the paint manufacturer is Sherwin Williams and does not disclose the... Last reply: Dulce Solis, Oct 10, 2024, 5:38 pm |
|
Definition of Informal TransitNC-v4 LTc5: Access to quality transitposted by Michelle Rosenberger on Oct 10, 2024, 12:21 pm
What is the definition of informal transit that is referenced in v4 Step 2 guidance? Last reply: Michelle Rosenberger, Oct 10, 2024, 12:52 pm |
|
IAQ testing credit substitution backwards from 4.1 to 4.0?NC-v4.1 EQc4: Indoor air quality assessmentposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on Sep 30, 2024, 5:15 pm
Hi all, I have heard that some teams have done a credit substitution from a v4.1 (New Construction) project backwards to the v4.0 criteria. I am somewhat skeptical of being able to do this... Last reply: Jeff Ross-Bain, PE, LEED Fellow, WELL AP, Oct 9, 2024, 10:32 am |
|
Switching Options Post-Preliminary Design ReviewNC-v4 LTc4: Surrounding density and diverse usesposted by Darrah Jakab on Oct 8, 2024, 6:27 pm
We are pursuing Option 2 and received comments in the preliminary design review that makes this option not tenable, but we believe we can achieve Option 1. Has anyone switched options post-... Last reply: Dave Hubka, Oct 9, 2024, 8:58 am |