Log in
Forum
Topic

LEED Online project registration number

General forums
posted by Tristan Roberts on Mar 12, 2010, 7:30 pm

Do you have any definite reason to think they're not one and the same?

What specific prereqs are you finding this with? Seems to me that this number is preloaded onto the credit forms. For...

Last reply: Rachael McClain, Mar 12, 2010, 8:00 pm

Faucets at Gallons per Cycle vs. Gallons per Minute

NC-2009 WEp1: Water Use Reduction
posted by Dave Intner on Feb 26, 2010, 1:25 pm

It seems to me that there is a large discrepancy in the baseline for gallons per minute versus gallons per cycle.

The LEED Online template states "When using the metering lavatory faucet...

Last reply: Dave Intner, Mar 12, 2010, 6:49 pm

ISSUE Part 2

CI-2009 IEQp1: Minimum indoor air quality performance
posted by Elizabeth Repin on Jan 26, 2010, 1:19 pm

This is taken from ASHRAE 62.1 2007 USERS MANUAL, Page 93
Example 6-E—Occasionally Occupied Spaces

Q
Table 6-1 lists ventilation requirements for infrequently
occupied...

Last reply: Gunnar Hubbard, Mar 12, 2010, 3:30 pm

Thank you for answer! But

General forums
posted by Armen Khachikyan on Mar 11, 2010, 8:08 am

Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up March 12, 2010- 9:51 am Lou, I recommend you subscribe to this site (LEEDuser) to get detailed information on the credit requirements, step-by-step things you need to do to achieve the credits, sample documentation, and of course access to this excellent forum! You can subscribe at this link. You will also need to register your project via LEED Online, which is the official place to submit project information and documentation. Our site, LEEDuser, offers numerous sample templates, documents,...

Last reply: Jean Marais, Mar 12, 2010, 10:24 am

Need 1 FTE to meet Minimum Program Requirements (MPRs)

General forums
posted by Tristan Roberts on Mar 11, 2010, 2:48 pm

Neil, it seems like the main consideration here is that you need at least one...

Last reply: Tristan Roberts, Mar 12, 2010, 7:25 am

That I can do. Thanks

General forums
posted by Neil Rosen on Mar 12, 2010, 5:30 am

That I can do. Thanks

FTE vs. transient

General forums
posted by Tristan Roberts on Mar 11, 2010, 2:56 pm

Neil, let's be clear -- FTEs and transients are two distinct numbers. So it sounds like you're all set with...

Occupant Comfort Levels

EBOM-2009 IEQc2.1: Occupant comfort - occupant survey
posted by RASHID HAMEEN on Mar 11, 2010, 2:26 am

Will it be sufficient enough to conduct the survey and to document it to obtain this credit..Does it require to invest on equipments to improve the air quality as most probably we are not planing...

Last reply: Tristan Roberts, Mar 11, 2010, 11:31 am

building complete 1993 or later

EBOM-2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
posted by Rachael McClain on Mar 10, 2010, 1:47 pm

I am confused by the table above with the tab that says building completed 1993 or later its says the baseline is 160%, the table also has a tab that says fixtures installed after 1993 or later,...

Last reply: Jason Franken, Mar 11, 2010, 10:55 am

questions

General forums
posted by Armen Khachikyan on Mar 11, 2010, 7:41 am

I've read practically all available resources, but I didn't find some details.
The fact is that we want to sertify our project in LEED. Now we haven't got completed project, but only ideas...

Last reply: Jean Marais, Mar 11, 2010, 7:53 am