I am confused by the table above with the tab that says building completed 1993 or later its says the baseline is 160%, the table also has a tab that says fixtures installed after 1993 or later, and the baseline for that is 120%. If the building was completed after 93' then the fixtures would of had to be installed after 93' as well. So why are these percentages different? Could someone please explain because the above explanation does not answer my question.