Forum quick links
CBE Tool
NC-v4 EQc5:Thermal comfortposted by Sara Hickman on
Does V4 still allow the CBE tool as a form of documentation for LO?
DOAS & VRF for LEED in EnergyPro
NC-v4 EAc2:Optimize energy performanceposted by Joel Embury on
I’ve been working on a LEED project with VRF & DOAS in San Jose, CA. For the LEED Energy Model, EnergySoft suggested attaching the DOAS to 10 sq. ft.
Outdoor Space
NC-v4 SSc3:Open spaceposted by Daniela Carrillo Lopez on
Would a picnic area with tables and chairs fulfill "a pedestrian-oriented paving or turf area with physical site elements that accommodate outdoor social activities"?
v4 compliant non-shrink non-metallic grout?
NC-v4 EQc2:Low emitting materialsposted by Laura Charlier on
Has anyone come across a v4 compliant non-shrink, non-metallic structural grout that meets ASTM C 1107?
EPD without program operator and/or specific PCR
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Paula Rantanen on
Hi all. Does anyone know whether it is required that an EPD must contain information about the Program Operator and the specific PCR that has been followed when conducting the LCA?
EDR Research Fellowship--please share with university contacts
posted by Z Smith on
Many on this list teach or have strong contacts with university programs, so I'm hoping to leverage our network in service of something that may be of general benefit.
Are Parking areas for Buses and Taxis included in Option 2
NC-v4 SSc5:Heat island reductionposted by Stephan Zweig on
Hello to all,
Do you have any suggestion if I have to include for Option 2 of heat island reduction credit the following:
1) Parking lots for Buses?
Area Weighted Average: White Roof, Green Roof, Sloped Roof with Metal Panel and Bulkhead
NC-2009 EAp2:Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on
CI 4.1 BPDO Calculator
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Deborah Stadler on
The 4.1 document released 1.22.19 has quite a few changes in the BPDO calculator reliant credits. Any idea when a new calculator incorporating these changes will be available for planning pur