Forum quick links
Enhanced acoustical performance - project in Sweden
Pilot-Credits EQpc57:Enhanced acoustical performance - exterior noise controlposted by Sandra Holmström on
We are pursuing this pilot credit for one Swedish Project.
CI-2009 EAc1.3, Motor Variable Speed Control
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by David Schaeffer on
I am working on a tenant build out where all the equipment is existing, as part of the recent core and shell build.
Campus Central Plant Thermal Storage Tanks
NC-v4 EAc4:Demand responseposted by Thomas Vu on
We have a lab project on a university campus which is fed chilled water from their central chilled water plant. The central plant also includes chilled water thermal storage tanks, which in e
How to achieve controllability for an arena
NC-v4 EQc5:Thermal comfortposted by Helene Lefkowitz on
Hello - The project I am working on will have an arena and auction hall in the building. It is my understanding these spaces are considered a shared multioccupant space per LEED.
Quick Survey to inform international efforts on Energy Assessments of buildings
posted by Nadav Malin on
Hi folks,
No cooling tower Sweden
Pilot-Credits WEpc94:No Cooling Towerposted by Sandra Holmström on
We are pursuing this pilot credit as ACP for a Swedish Project.
Circulation of Fresh air via AHU
CI-v4 EQp1:Minimum indoor air quality performanceposted by BEE Incorporations on
My project has 3 areas. Project AHU serves conditioned air to Area 1,2 and 3. The fresh air is supplied only to Area 1 directly from base building AHU due to constraints.
Energy sourse - pellets
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings,
Our project has as an energy source pellets – type agricultural crop or waste (sunflower waste).
OA in baseline model for residential building
NC-v4 EAp2:Minimum energy performanceposted by Nicolas Martinez Ochoa on
Hello,