Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Harvested rainwater treatment

NC-v4 SSc4:Rainwater management
posted by  FABIO VIERO  on 

As stated in the Leeduser’s viewpoint the SSc4: Rainwater management is a combination of stormwater quality control and quantity control of previous LEED V3 credits SSc6.1 and SSc6.2.

3
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Mon Feb 25, 2019, 7:46 pm

Natural ventilation – modeling in Baseline

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings,

The project that we are modeling has zones with natural ventilation LEED v2009).

3
Mon Feb 25, 2019, 5:34 pm

Best /easiest/fastest way to measure density?

CI-v4 LTc2:Surrounding density and diverse uses
posted by  Deborah Stadler  on 

For a site in Manhattan, just by using Google Earth and drawing a 1/4 mile circle is easy to see that the density is met without any issues.  But for sites near open spaces, or in suburban are

2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Mon Feb 25, 2019, 4:43 pm

Points for being in a LEED certified base building

CI-v4 MPR1:Must be in a permanent location on existing land
posted by  Dee Spiro  on 

Hi all - I seem to remember seeing something recently about LEED v4 (or v4.1) ID+C projects again being eligible for points for locating in a LEED certified base building (harkening back to the day

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Feb 25, 2019, 4:02 pm

only 2 subsystems required?

CS-v4 WEc4:Water metering
posted by  Jens Apel  on 

I just want to make sure that it is sufficient to meter 2 subsystems; not all that are available in a project.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Feb 25, 2019, 3:25 pm

Restaurant for office emloyees only

NC-v4 LTc6:Bicycle facilities
posted by  Sandra Holmström  on 

The Project has a restaurant that is for office-employees only - can the transients be counted as 0 if the restaurant only will be used by employees?

1
Mon Feb 25, 2019, 3:16 pm

average daily visitors

NC-v4 LTc6:Bicycle facilities
posted by  Sandra Holmström  on 

I would like to know how to calculate average daily visitors. Should it be 11 or 99 average Daily visitors?

0

Permanently installed drip irrigation system

CS-2009 WEc1:Water Efficient Landscaping
posted by  Andreas Hintz  on 

In accordance with the requirements of this credit, the project team has developed and will implement a water-efficient landscape stategy. The project is aiming for Option 2, No Potable Water

3
Default Avatar
Dipl.-Ing. Architekt, LEED AP (BD+C), BREEAM In-Use Auditor, DGNB Auditor
ikl GmbH
LEEDuser Basic Member
7 thumbs up
Fri Feb 22, 2019, 3:03 pm

Modeling Microturbines in EnergyPro

NC-v4 EAc2:Optimize energy performance
posted by  Joel Embury  on 

I'm working on a 5 story hotel in San Jose, Ca.  The project is considering adding Microturbines.  Has anyone modeled these in EnergyPro?  If so, are they modeled in a similar manner

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Feb 21, 2019, 10:22 pm