Forum quick links
Tenant lighting savings without layout
CS-v4 EAp2:Minimum energy performanceposted by Przemysław Rejczak on
Dear Everyone,
Generaly for CS project we model tenant spaces as unfinnished and we use perimeter/core zonning method.
Female Bidets in LEED calculation?
NC-v4 WEp2:Indoor water use reductionposted by Hieu Huynh on
Hi LEED experts,
Glare-control devices - glazed doors?
CI-v4 EQc7:Daylightposted by Victoria Watson on
Hi - When the user guide says "provide glare-control devices for all transparent glazing" does it really mean all? I am assuming it doesn't mean high volume doors with transparent gl
Light Pollution Reduction credit threshold
NC-v4 SSc6:Light pollution reductionposted by Francesco Passerini on
Dear all,
Lighting power in tenant spaces
CS-v4 EAp2:Minimum energy performanceposted by Matt Edwards on
We have a question about the baseline and proposed lighting for tenant spaces, and more specifically how to input those in the LEED v4 Minimum Energy Performance Calculator v05 spreadsheet.
Separation of space requirements if stove is separately vented
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Ann Kelly on
All,
If we have an electric residential grade stove, which is separately vented, located in an open break room setting, will this satisfy the requirements for separation of space?
Water Restoration Credits - Asia
Pilot-Credits WEpc110:Water Restoration Certificates®posted by Emily Tan on
I purchased water restoration certificates for an ID+C v4 project through BEF.