Log in
Forum » Asia – East
Topic

Enhanced EPD program

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Akira Kataoka on Nov 15, 2016, 2:44 am

I understand that USGBC are seeking feedbacks from stakeholders on the draft EPD guidance.

When is the final version scheduled to be ready and when would the guidance become effective?...

Last reply: Tristan Roberts, Nov 15, 2016, 8:35 pm

Historic site

CS-v4 LTc3: High Priority Site and Equitable Development
posted by Jie Xiong on Nov 11, 2016, 1:52 am

Hi
I am new to V4. There is a question about this credit. On the RG, page 75 further explanation, says that "project may......indicates has significant historic or cultural value". How...

Last reply: Tristan Roberts, Nov 15, 2016, 6:48 pm

Energy Star Related Product

Retail-CI-v2009 EAp2: Minimum Energy Performance
posted by Wei Zeng on Aug 11, 2016, 4:12 am

Hello:
I am working on a convenience store applying for LEED CI Retail 2009 certification, the project plans to design two outdoor air-cooled condensing unit which would be used as the...

Last reply: Ron Dean, Oct 26, 2016, 5:58 pm

questions about additional HVAC system in kitchen

CS-2009 EAp2: Minimum Energy Performance
posted by Zhang Peng on Aug 28, 2016, 11:50 pm

Our project is a high rise building, which consists of offices, bank, dining area and so on. Now it is under the LEED V3 CS review. I have a question about the spaces which are not normally...

Last reply: Marcus Sheffer, Aug 30, 2016, 9:53 am

Faucet Flowrate at Actual Water Supply Pressure

CI-2009 WEp1: Water Use Reduction
posted by Ran Zhang on Aug 30, 2016, 3:48 am

Hi all,
I have a question in regard to the flowrate of faucet, whether it should be based on the 60psi specified by LEED or local water supply pressure. There have been a few discussions on...

Energy Star equipment

CI-2009 EAp2: Minimum Energy Performance
posted by mingyu Zhang on Apr 11, 2016, 3:57 am

Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5578 thumbs up August 16, 2016- 11:02 am Yes that will ensure that the tenant can meet this requirement if they pursue a CI certification. This prerequisite is related to the tenant scope of work and they need to meet these requirements if they pursue a CI certification. If you are doing a CS project please post your question in the applicable forum. Log in or register to post comments ...

Last reply: Marcus Sheffer, Aug 16, 2016, 11:02 am

Low-Emitting Content Criteria for Wallcovering in EBOM v2009

EBOM-2009 MRc3: Sustainable Purchasing—Facility Alterations and Additions
posted by Noriko Nagazumi on Aug 9, 2016, 5:56 am

Do you have any idea for Low-Emitting Content (...

Last reply: Kimberly Schlaepfer, Aug 12, 2016, 2:34 pm

Ventilation and filteration for Staircase for Feature 64

WELL v1 Building Standard Tip Sheet
posted by Xinrong Zhao on Jul 25, 2016, 10:16 pm

Hello, Thank you Tristan for adding a WELL discussion to this site. My rpoject is an 18 floor residential project. The staircase is use for Fire exits. But to achieve the Feature 64, the accessor...

Last reply: Brian Salazar, Aug 10, 2016, 4:46 pm

parking area under cover

CI-2009 SSc3.3: Alternative Transportation—Parking Availability
posted by ANNA SUN on Mar 15, 2016, 10:30 pm

my Project is in Shanghai China.I am preparing PI Form form my project. Now I have a question about parking area. our office located in a high rise building,we only rent one floor of this...

Last reply: Heather Walters, Aug 5, 2016, 1:44 pm

a question about DES option 1

CS-2009 EAc3: Enhanced Commissioning
posted by Shenhao Li on Jul 25, 2016, 7:51 am

Hello!
I have a question about EAc3 for...

Last reply: Scott Bowman, Jul 27, 2016, 7:23 pm