Exterior Building Lighting façade - MANDATORY PROVISIONS ASHRAE 90.1 - 2010

NC-v4 EAp2:Minimum energy performance
posted by  Sara BENLOUBA  on 

We are currently developing a large-scale lighting project for which we need to clear up some doubts about ASHRAE 90.1 regulations – section 9.4 – 2010 regarding exterior facade lighting.

5
Default Avatar
Green building manager
Confidential
LEEDuser Basic Member
13 thumbs up
Mon Dec 28, 2020, 5:48 pm

Number of Units Required to be Sampled

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Abena Darden  on 

We are working on a high-rise residential project in San Francisco. I see a question relating to how many residential units need to be blower door tested dating from June 24 2014.

3
Default Avatar
Architect
Efizity
LEEDuser Basic Member
0 thumbs up
Thu Dec 24, 2020, 7:57 pm

Update and Invitation for FUN! Lighter Side of Green

Sustainable Advising Leaders
posted by  Barbra BatShalom  on 

Thanks to those of you who signed up to share your (other) talents!!!

2
Thu Dec 24, 2020, 6:38 pm

Manufacturing waste for compliance

Warehouses-EBOM-v4 MRc4:Solid waste management - ongoing
posted by  FARIZAN DAVEZAC  on 

I have a warehouse with a manufacturing area. The waste from the manufacturing area is already being diverted, as it's collected by a recycling facility.

0

Biophilic Design

NC-2009 IDc1:Innovation in Design
posted by  Brightworks Sustainability  on 

Has anyone successfully pursued Biophilia/Biophilic design as an innovation credit for LEED-NC v3 or v4? If so, what exactly is required? Thank you.

3
Sustainability Strategist
Associated Engineering
LEEDuser Basic Member
2 thumbs up
Thu Dec 24, 2020, 12:00 am

sphagnum peat moss.

NC-v4.1 SSc2:Protect or Restore Habitat
posted by  Dionisio Franca  on 

Hi!
Why should't imported soils include sphagnum peat moss? Is it to protect natural habitats with moss?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Wed Dec 23, 2020, 10:36 pm

Can lab surfaces be excluded?

CI-v4 EQc6:Interior lighting
posted by  Kristen Magnuson  on 

I'm working on a lab TI. The project's work surfaces include both lab tables and typical office-style workstations.

2
Default Avatar
SL+A INTERNATIONAL ASIA INC.
LEEDuser Premium Member
305 thumbs up
Wed Dec 23, 2020, 9:15 pm

VOC content - all or nothing?

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Tommy Linstroth  on 

Based on this language from USGBC - At least 75% of all paints and coatings, by volume or surface area, meet the VOC&nbsp

4
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Wed Dec 23, 2020, 6:17 pm

No Restrooms!

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Diego Pietzsch  on 

I do have two buildings in the same campus trying to certificate for LEED EBOM.

4
LEED Professor
PUCP, Peru
LEEDuser Basic Member
0 thumbs up
Wed Dec 23, 2020, 1:09 am

Performance period

EBOM-v4 EQc7:Green cleaning - products and materials
posted by  DAVE LI  on 

Does the performance period of the provision only take three months or more?

4
Green Building Consultant | Researcher
GreenA Consultants
LEEDuser Basic Member
38 thumbs up
Wed Dec 23, 2020, 12:22 am