Forum quick links
Garden Sizing?
Pilot-Credits SSpc82:Local food productionposted by Ty Champion on
Good morning all,
For a schools project, does LEED stop ccounting garden area after the maximum 1500 SF?
Thanks,
Ty
No cooling tower - Group Approach Project
Pilot-Credits WEpc94:No Cooling Towerposted by Alejandro Quiroga on
Dear all,
I have also some doubts about this Pilot Credit (No Cooling Tower):
LEED Consultants working in remote mode.
NC-v4 SSp1:Construction activity pollution preventionposted by Olga Yuil on
As LEED Consultants we are working in remote mode because of COVID-19 risk.
The Project Team is concern about how this may or may not affect the certification.
Reuse of emergency water for toilet flushing?
NC-v4 WEc2:Indoor water use reductionposted by Erin Holdenried on
We have a laboratory project with emercency eye wash and shower stations that has a dedicated water supply. The water in the pipes serving these fixtures must be flushed on a regular basis.&n
DOL registered apprenticeship programs
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Kavita on
Is there any website wherein one can check the Department of Labor registered apprenticeship programs?
The Business of Healthy Buildings 12/9 @ 1 PM EST
posted by Steven Burke on
Hi All, I was initially reluctant to share this, but I've seen similar posts and I think it's in line with our mission and interests so I'll go ahead with it.
Filtration Requirement for a Evaporative Cooling System
NC-v4 EQp1:Minimum indoor air quality performanceposted by Krithikha Muthukrishnan on
Hi,
Including racks in the assessment
NC-v4 MRc1:Building life-cycle impact reductionposted by Agnieszka Kaczmarek on
According to Option 4: can I include in the assessment metal racks in a warehouse?