Forum quick links
Green Power Query
NC-v4 EAc7:Green power and carbon offsetsposted by Andrei Sabater on
I am Andrei Sabater, employee of ecoSolutions, Right now we are currently studying the credit for the green power and carbon offsets. Is the credit applicable here in the Philippines?
Adding LEED BD+C to Linkedin
posted by Bob Adedayo on
Hello,
Does anybody know how add LEED BD+C to linked in? I have tried adding it beside my name but it appears linked in does not accept +.
How to face nova mutation virus by using Re-Enter Your Workspace method?
Pilot-Credits INpc136:Safety First: Re-Enter Your Workspaceposted by yingling guan on
ReOccupancy_Assessment_Tool is a good guide for the proverty management of public areas, but it is difficult to implement the internal management of small tenants. Is there a convenient tool
Option 2 - All or nothing
NC-2009 MRc5:Regional Materialsposted by Jaida Anderson-Lozano on
Our project has been collecting documentation for this credit for some time with Option 1 before Option 2 addendum became available.
Lighting Zone classification for a mixed-use area
NC-v4 SSc6:Light pollution reductionposted by Gino Liu on
Dear all,
Electric Charging Stations out of Leed Boundary
NC-v4 LTc8:Green vehiclesposted by Jorge Lopez de Obeso on
Hi !
Leed v4:
INpc156 - Safety First: Maintenance of HVAC systems during COVID-19
Pilot-Credits INpc156:Safety First: Maintenance of HVAC systems during COVID-19posted by SIG - Sustainability Main Account on
My project is pursuing pilot credit INpc156 for Maintenance of HVAC systems.
Option 2 Natural land cover conditions
NC-v4.1 SSc4:Rainwater Managementposted by Allen Cornett on
With the "retain on site" verbiage is there no longer an option to retain off-site? I have a project in a development that previous buildings have met the LEED 2009 stormwater&
Cultural smudging and ETS prereq
NC-v4 EQp2:Environmental tobacco smoke controlposted by Jason Burtwistle on
Hi all,
Concrete Recycled Content
NC-2009 MRc4:Recycled Contentposted by MT A on
We have the final content $ value of cementitious materials and the m3 of concrete produced as supplied by the contractor.