Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

INPc136_Daily Journals

CS-2009 IDc1:Innovation in Design
posted by  Juan Guerrero  on 

Hi everyone, I have a question from the credit Safet First: Re-Enter Your Workspace.

0

Monitor-Based Commissioning

NC-v4 EAc1:Enhanced commissioning
posted by  Dave Hubka  on 

Why can't Monitor-Based Commissioning be achieved without pursuing the Enhanced Commissioning path?

3
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed Sep 15, 2021, 10:59 am

3-equal Dual-Flush flushometer valves?

SD Leaders
posted by  Dan Jaconetti  on 

Looking for 2-more flushometer style dual-flush flush valves to put in a public project spec alongside sloan uppercut and cannot seem to  find any.  Does anyone have any that th

0

Participating in the LEEDuser pilot credit forum

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Gail Vittori  on 

We are pursuing this pilot credit for multiple unrelated projects.

0

LEED HC v4/v4.1 - Water Use Reduction & Sterilizer's

SD Leaders
posted by  Allison Smith  on 

Are any of you working on projects that are pursuing the additional point for Indoor Water Use Reduction on a HC project via Table 4 Compliant laboratory and medical equipment? If so, what ste

0

Glare control requirements for Nordic projects

NC-v4.1 EQc7:Daylight
posted by  Medina Deliahmedova  on 

Dear All,

I am an engineer at Inform Design (consulting practice based in Sweden), and we are working on a large office building project which aims to acquire LEED certificate.

0
3
Tue Sep 14, 2021, 12:49 am

SR Values Needed

Schools-NC-v4 SSc5:Heat island reduction
posted by  Brian Salazar  on 

Hello!  Has anyone found a reliable list of SR values for materials often used at schools?  For example, Outdoor tracks which have an applied coating?

3
Tue Sep 14, 2021, 12:49 am