Forum quick links
Dynamic Shading
posted by Jonathan Weiss on
I am putting together a presentation for our local AIA conference specifically about shading devices / dynamic glazing / dynamic shading and wonder whether any of you have experience / feedback fro
Energy French regulation equivalence
NC-v4.1 EAp2:Minimum Energy Performanceposted by Axel Verger on
Hi everyone,
There IS Hope!
posted by Mary Ann Lazarus on
Dear Colleagues: A climate scientist family member who I respect deeply shared this youtube with me. I thought it was worth sharing with all of my GreenGuru friends. Let's keep on keeping on!
WEpc94 No Cooling Tower
Pilot-Credits WEpc94:No Cooling Towerposted by Dave Hubka on
This ACP will soon be closed. Once closed it will not be available regardless of project registration date.
USGBCs online web-based reference guide
NC-v4 MPR1:Must be in a permanent location on existing landposted by Kavita Karmarkar on
Posting this question here since it does not belong to any credit in particular.
*Time Sensitive* infrastructure/stimulus $$ advocacy letter sign-on opportunity
posted by Clark Brockman on
Hi Folks - sorry for the late notice, but I just heard about this two days ago and needed to get confirmation that I could share the request with htis group.
TR-55 availabe outside US
Pilot-Credits SSpc45:Site assessmentposted by Javier Garcia Jones on
Hi, We are working in a project that it's an extension of an existing building. Our project is located on an almost flat plot. We have consider all issues related to this credit but we have some pr
Non-certified buildings in LEED boundary
NC-v4 MPR2:Must use reasonable LEED boundariesposted by marty seese on
I have a project that is all new construction. There are 3 buildings on the site. The main building which is what the owner wants to be LEED Certified. Another building is a shed building.
NC & CI projects
Pilot-Credits WEpc110:Water Restoration Certificates®posted by Sheryl Swartzle on
I found the purchasing process for Water Restoration Certificates to be very easy with BEF. The benefits are easily understood by the clients and on our CI project the cost was very reas