FAQs about EAp2 :

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

View answers »

Forum discussion

CS-2009 EAp2:Minimum Energy Performance

Insulation requirements

Our LEED building consits on an 39 stories speculative office building that is on top of a 3 stories retail building. The retail will not apply for LEED certification. The retail's roof will serve as a terrace for the speculative office building and will consit of a mixture of greenroof and hardscape. ¿Is there any insulation requirement for this slab? It will covered a retail space that will not be part of the LEED certification. So far roof insulation requirements for the LEED building is observing R15 for the slab at level 39, but we want to confirm that the terrace is free of any insulation requirements. Any comments will be appreciated.

2

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 11/01/2011 - 23:07

Let me make sure I understand the question. Is it insulation between the top of the retail and the bottom of the office or is it insulation in a roof over the retail which serves as a terrace? If between the two spaces, then it would be considered a floor. If a roof, then a roof. The insulation levels required are contained in Table 5.5-X in ASHRAE 90.1-2007 and vary by climate zone. The real question should be what is the appropiate level of insulation given the situation. If it is the roof of a retail facility it probably makes sense to insulate it in most climates.

Wed, 11/02/2011 - 15:47

The office building floor would only require insulation if it were unconditioned space below. The retail roof/office building terrace should be insulated, but since the retail is not being certified, LEED will not care what you do there. It will not affect the results of the office building energy model.

Tue, 11/08/2011 - 19:50

Thank you so much. Marcus, the retail's roof will serve as a terrace of the office building. I forgot to mention that the retaill surpass by a lot the office building perimeter (that's why its roof can serve as a terrace for the office building). It makes sense to insulate it, however it is not a requirement by law, so it might end up having no insulation at all by ownership requirements. Only LEED requirements (the prerrequisites) will be observed. Thank you Christopher, it makes sense, i thought the same too, that LEED will not care whether the space below complies with ASHAREA (including obviously the insulation requirements). I just wanted to double check.

Tue, 11/08/2011 - 20:20

Wow no applicable local or state energy code to require a minimum insulation level. Where is the project located? Those of use involved with LEED do care about proper insulation levels but LEED may not require you to do anything about it. :-) A potentially tricky part could be where you draw the line for your LEED project. If the terrace is in the LEED boundary, the horizontal placement of that line will need to be defined.

Tue, 11/08/2011 - 20:37

Thank you Marcus. The project will be built by phases, being phase 1 the office building (the one applying for LEED certification). The LEED boundary is drawn covering exactly that phase leaving the retail out of the LEED scope, but including the terrace within phase 1.