Forum quick links
non default occupancy numbers
NC-2009 IEQp1:Minimum IAQ Performanceposted by Veronika Sundberg on
We want to use non default occupancy values for some rooms in our project. Do anyone have experience what the reviewers might have for thoughts regarding this.
What can we claim?
NC-2009 IDc1:Innovation in Designposted by Clare Parry on
Hi all, We have just received our Construction Prelim results and comments.
EA Credit 1 Optimize Energy
posted by Jonathan Weiss on
I had posted this comment during the first public comment period, but there was not much in the way of response, so I wanted to bounce it off this group for feedback - I am curious about the new re
LEED NC or CS? One building or two?
posted by David Sheridan on
My client owns two existing buildings that abut one another. He plans to renovate and add onto both buildings. First floor will be retail - probably separate tenant on either side.
Applying Addenda?
posted by Barbara McCrary on
Does anyone know how to apply an Addenda to a credit, if the Addenda was issued AFTER the project was registered? Do I simply write a narrative explaining that I have applied an Addenda?
% Regional
CI-2009 MRc5:Regional Materialsposted by Beth Cheuvront on
For this credit the form has three columns - Column 1 - % Regional Colum 2 - Extraction Miles Column 3 - Manufactured miles We are not going for the regionally extracted point only the regional
PI Form 3 - Unconditioned gross area
posted by Kenneth Van Riper on
Is mechanical space that contains unit heaters but no other heating or cooling considered unconditioned area for the purposes of Table PIf3-1?