Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Health club membership

CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Sheela I  on 

If the building has a health/fitness club and is not free to all tenants - does this credit apply?

6
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Fri Oct 28, 2011, 4:47 pm

Kitchens in Residential projects - regularly occupied?

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Iris Amdur  on 

I am working on a residential building, and we are deciding whether or not the kitchens in each residential unit would be included in the daylighting calculations.

4
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Fri Oct 28, 2011, 12:35 am

Using PHPP for EAp2/EAc1 modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  Lyle Axelarris  on 

Is it possible to use PHPP software (Passive House Planning Package) for energy modeling on a LEED-NC project? Does anyone have experience with this?

3
Default Avatar
Civil Engineering Intern, LEED GA
Design Alaska
LEEDuser Basic Member
21 thumbs up
Thu Oct 27, 2011, 6:43 pm

"building floor area" and "conditioned square footage"

General forums
posted by  Daniel Costantino  on 

Hello, I've struggled for a while with the exact definition of various floor area related terms in LEED ND.

2
Default Avatar
Urban Planner, LEED AP ND
Ecology & Environment, Inc.
LEEDuser Basic Member
56 thumbs up
Thu Oct 27, 2011, 5:18 pm

Question

posted by  valtcheva vessela  on 
5
Thu Oct 27, 2011, 1:17 pm

Project Registration Fee - Non-member or USGBC Member

Understanding the Cost of LEED-NC Project Certification
posted by  Kendal Neitzke  on 
I am looking for a clarification on who qualifies for the USGBC Member Fee for a registered project - does the project owner need to be a USGBC member or is it the LEED Administrator who registers the
4
Default Avatar
Project Designer
Risinger + Associates
LEEDuser Basic Member
39 thumbs up
Thu Oct 27, 2011, 3:35 am

Determining the number of full time equivalent (FTE) occupants

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Rudolph Schaar  on 

To determine the demand for water, what number should be used for FTE occupants - the number of occupants that the building is being designed for, or the maximum number of occupants calculated usin

2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Thu Oct 27, 2011, 2:25 am

Can rainwater tank be connected to the potable water system?

CS-2009 WEc1:Water Efficient Landscaping
posted by  Adam Targowski  on 

I would like to comply with the requirements of this credit by the use of captured rainwater for irrigation purposes.

3
Wed Oct 26, 2011, 10:24 pm

LEED 2009 Energy Modeling using HAP 4.3

NC-2009 EAc1:Optimize Energy Performance
posted by  Arub Vijay  on 

Is it acceptable to conduct the LEED 2009 Energy Modeling using Carrier HAP 4.3 version?

2
Wed Oct 26, 2011, 9:46 pm

EA p2 Section 1.4.xls

NC-2009 EAp2:Minimum Energy Performance
posted by  Sari Kujawa  on 

First time submitting NC 2009 V3 forms. Filling out the EAp2 Section 1.4. xls file.

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Wed Oct 26, 2011, 6:26 pm