MRp1 Can a designated dumpster serve as my area of recycling?NC-2009 MRp1: Storage and Collection of Recyclablesposted by Shelly Christman on Jan 13, 2016, 12:11 pm
Hello All, Last reply: Judhajit Chakraborty, Jan 27, 2016, 1:06 pm |
|
FTE of unoccupied gutted adjacent tenantCredit Forumsposted by Andrew Bennett on Jan 27, 2016, 11:21 am
under case 2 option 1 this space would not add any... |
|
Baseline HVAC SystemsNC-2009 EAp2: Minimum Energy Performanceposted by Khaled Fouda on Jan 26, 2016, 11:28 am
I am Energy Modeling a highrise new construction in NYC. The building total area is 150,000 SF but the nonresidential areas combined are more than 20,000 SF therefore the building complies with G... Last reply: Marcus Sheffer, Jan 27, 2016, 10:29 am |
|
Planting recycled conentNC-2009 MRc4: Recycled Contentposted by Thomas Perkins on Jan 25, 2016, 1:05 pm
“Site materials (31.60.00 Foundations, 32.10.00 Paving, 32.30.00 Site Improvements, and 32.90.00 Planting) that are permanently installed can be included in the MR credits. Just be sure that your... Last reply: Jon Clifford, Jan 26, 2016, 7:04 pm |
|
Existing Building Envelope does NOT Meet ASHRAE 90.1-2007CI-2009 EAp2: Minimum Energy Performanceposted by James Keohane on Jan 26, 2016, 2:59 pm
How do you meet and demonstrate requirements of EApr2 if elements of the existing building envelope does NOT meet 90.1-2007 Prescriptive measures? One thought: Can you use Building Performance... Last reply: Marcus Sheffer, Jan 26, 2016, 6:02 pm |
|
Airflow testing serviceEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Saul Pichardo, AIA on Jan 26, 2016, 5:30 pm
Hi All, We are looking for a company in the San Francisco Bay Area who can conduct the airflow tests in our commercial building (in the office area). We are working on a LEED O&M... |
|
Size of mapNC-2009 SSc2: Development Density and Community Connectivityposted by Dave L on Jan 22, 2016, 5:10 pm
I have a project in which I need to “provide a revised map that highlights the existing residential area and... Last reply: Dave L, Jan 26, 2016, 2:52 pm |
|
Spring and Fall Conditions on the Thermal Comfort ToolCI-2009 IEQc7.1: Thermal comfort - designposted by Logan Dorrell on Oct 15, 2015, 7:17 pm
What are we supposed to submit for the "Spring" and "Fall" conditions for the Thermal Comfort Tool for Upload IEQc7.1-2? We have design setpoints for cooling and heating and easily... Last reply: Logan Dorrell, Jan 26, 2016, 1:52 pm |
|
CS Project with no ref equipmentCS-v4 EAc6: Enhanced Refrigerant Managementposted by Martin Stowell on Jan 26, 2016, 12:39 pm
I am working on a CS project and the drawings do not have any planned ref equipment since this will be at the tenants discretion to decide at a later date. If our plans do not include ref... Last reply: Tristan Roberts, Jan 26, 2016, 12:53 pm |
|
Miles per gallonEBOM-2009 SSc4: Alternative Commuting Transportationposted by Jennifer Webb on Jan 25, 2016, 7:58 pm
Hello, We are conducting a survey with government employees and are trying to reduce the survey length as much as possible. Do miles per gallon (mpg) need to be included in the... Last reply: Trista Brown, Jan 26, 2016, 10:47 am |